On this page 6
When a permit is required
Permit triggers and exempt work for Sioux Falls
New construction, additions, lower-level finishes, decks, remodels, window and exterior door replacement, re-shingling, re-siding, storage buildings over 200 sq ft, fences over 7 feet high, razing
- Exempt Retaining walls under 4 feet in height
- Exempt Painting and finish work (wallpaper, cabinets, carpet)
- Exempt Window awnings projecting less than 54 inches from exterior wall
- Exempt Kitchen cabinet replacement
- Exempt Playground equipment
- Exempt Fences 7 feet or under (zoning permit may still apply for shorter fences -- confirm with zoning)
- Exempt Storage buildings 200 sq ft or under
- Building permit application
- Construction plans/blueprints
- Site plan
- Mechanical/electrical/plumbing specs
- Residential and commercial submittal checklists
- Building code
- 2021 International Building Code (IBC), 2021 International Residential Code (IRC), 2021 International Existing Building Code (IEBC), 2021 International Mechanical Code (IMC), 2021 International Fuel Gas Code (IFGC), 2021 International Swimming Pool and Spa Code (ISPSC), 2020 National Electrical Code
- Owner-builder
- Homeowners are not required to hold a contractor license to perform work on their own property; a building permit is still required.
- Contractor requirements
- Residential contractors performing work requiring a building permit on 1- and 2-family dwellings and townhomes must hold a City of Sioux Falls Residential Building Contractor license, which requires passing the Construction Supervisor Examination; a surety bond is also required.
Application process
Typical processing: Residential approximately 48 hours for plan review; commercial varies
- 01 Determine whether a permit is required by reviewing the city's permit information page or calling Building Services at (605) 367-8670.
- 02 Create an account on the CSS portal.
- 03 Prepare all required documents: completed application, construction plans/blueprints, site plan showing property boundaries and proposed work, mechanical/electrical/plumbing specifications.
- 04 Submit application and documents through the CSS portal.
- 05 Await plan review. Residential plans are generally reviewed within 48 hours.
- 06 Pay all applicable fees through the portal before permit issuance.
- 07 Post the permit card visibly at the job site.
- 08 Schedule required inspections through the CSS portal or by calling (605) 367-8670.
- 09 Obtain final inspection approval and certificate of occupancy where required.
Typical processing time: Residential approximately 48 hours for plan review; commercial varies
Source: Building Services Division, City of Sioux Falls Planning and Development Services ↗
Fee schedule
Effective January 1, 2026
Fees paid through CSS portal prior to permit issuance
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 1, 2026) before budgeting.
Required inspections
Scheduling and sequence
- CSS portal (online)
- (605) 367-8670 (phone)
- Inspection hours
- Monday-Friday, 8:00 AM - 5:00 PM
Typical sequence: Footing/foundation, framing, mechanical/electrical/plumbing rough-in, insulation, final inspection and certificate of occupancy
Frequently asked
Common questions about Sioux Falls permits
01 Do I need a building permit in Sioux Falls, SD? ▸
02 How much does a building permit cost in Sioux Falls, SD? ▸
03 How do I apply for a building permit in Sioux Falls, SD? ▸
04 How long does it take to get a building permit in Sioux Falls, SD? ▸
05 What work is exempt from building permits in Sioux Falls, SD? ▸
06 How do I schedule a building inspection in Sioux Falls, SD? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Services Division, City of Sioux Falls Planning and Development Services before applying. Jaspector is not legal advice.