On this page 6
When a permit is required
Permit triggers and exempt work for Easley
Structural remodeling or additions, electrical/plumbing/mechanical work, and structures 200 square feet or greater; any structure of any size with plumbing or electricity.
- Exempt Residential roofing
- Exempt Vinyl siding
- Exempt Window replacement
- Exempt Fences
Note: Contact the Building Department to confirm whether edge cases are exempt from permitting.
- Residential or commercial building permit application
- Commercial projects require two stamped hard-copy plan sets for review
- Owner-builder disclosure if a homeowner pulls a permit for a primary residence
- Building code
- 2021 International Building Code, 2021 International Residential Code, 2021 International Fire Code, 2021 International Plumbing Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2009 International Energy Conservation Code, 2021 International Property Maintenance Code, 2021 International Existing Building Code, and 2020 National Electrical Code.
- Permit validity
- Not clearly posted on the current city pages reviewed.
- Owner-builder
- A homeowner may pull a permit only for a primary residence, not a rental property, and must complete and record an Owner/Builder Disclosure form with Pickens County.
- Contractor requirements
- Easley's published materials point contractors to city business license requirements and staff review; the fee schedule notes contractors should check with the Finance Department regarding a City Business License.
Application process
Typical processing: Not publicly stated on the current Easley pages reviewed.
- 01 Confirm whether a permit is required. Easley says permits are required when remodeling or additions change structural conditions or include electrical, plumbing, or mechanical work, and for any structure 200 square feet or greater or any structure of any size with plumbing or electricity.
- 02 Download the residential or commercial building permit application from the Building Department page.
- 03 For commercial work, mail or deliver two stamped hard-copy plan sets to the City of Easley Building Department, attention Tor Ellstrom, 205 N 1st St., Easley, SC 29640.
- 04 Coordinate plan review or code questions with the Building Official and schedule inspections through the department.
- 05 Pay permit fees under the published schedule once staff completes review and issues the permit.
Typical processing time: Not publicly stated on the current Easley pages reviewed.
Fee schedule
Easley building permit fees
Current public materials do not state online payment instructions for building permits.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (864) 855-7908 (phone)
- Scheduling deadline
- At least 24 hours notice required.
Typical sequence: Footing; plumbing under slab; slab; rough-in; insulation and house wrap; temporary permanent power; final inspection.
Frequently asked
Common questions about Easley permits
01 Do I need a building permit in Easley, SC? ▸
02 How much does a building permit cost in Easley, SC? ▸
03 How do I apply for a building permit in Easley, SC? ▸
04 How long does it take to get a building permit in Easley, SC? ▸
05 What work is exempt from building permits in Easley, SC? ▸
06 How do I schedule a building inspection in Easley, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department, City of Easley before applying. Jaspector is not legal advice.