jaspector
County building permits

Unincorporated Dorchester County

How to apply for a building permit in unincorporated Dorchester County, South Carolina. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Dorchester County Building Services

Street address
500 N Main St, Summerville, SC 29483
Coverage
Applies to unincorporated Dorchester County only; incorporated municipalities such as Summerville, North Charleston, St. George, and Ridgeville may have separate permit authority inside their limits.
Online portal
Evolve
Evolve
§ 02

When a permit is required

Permit triggers and exempt work for Dorchester County

The county states Building Services is responsible for issuance of residential and commercial building permits for new construction and renovations in unincorporated Dorchester County.

Note: No county-published general exempt-work list was found on the reviewed Building Services pages. Confirm project-specific exemptions directly with Building Services before proceeding.

Required documents
  • County building application or Evolve submission
  • Plans and project materials required by the county submittal process
  • Additional floodplain, GIS, RV/manufactured-home, or land-disturbance materials where applicable
Building code
2021 International Building Code; 2021 International Fire Code; 2021 International Plumbing Code; 2021 International Mechanical Code; 2021 International Fuel Gas Code; 2020 NEC; 2021 International Residential Code; 2009 IECC; 2021 International Existing Building Code
Permit validity
No clear permit-expiration rule was found on the reviewed county building-services pages.
Owner-builder
No clear owner-builder rule was found on the reviewed county building-services pages.
Contractor requirements
State-level contractor and trade licensing remains governed by South Carolina LLR; local permit approval and inspections remain county-controlled.
§ 03

Application process

Typical processing: No general permit-review turnaround was clearly published on the reviewed county building-services pages.

  1. 01
    Confirm the property is in unincorporated Dorchester County rather than inside a municipality.
  2. 02
    Use the county Apply Online page to submit in Evolve, or use the county building application as directed.
  3. 03
    Follow the county submittal process and upload the required plans and project materials.
  4. 04
    Complete any floodplain or land-disturbance review steps required for the site.
  5. 05
    County staff review the submittal for code compliance and issue comments if revisions are needed.
  6. 06
    After approval, obtain the permit and keep permit documentation on site.
  7. 07
    Schedule inspections through the county; next-day inspections require contacting the office no later than 3:00 pm the business day before the requested date.

Typical processing time: No general permit-review turnaround was clearly published on the reviewed county building-services pages.

Source: Dorchester County Building Services ↗

§ 04

Fee schedule

Dorchester County building permit fees

Fee type
Amount
01
Minimum permit fee
Not publicly confirmed during this review.
02
Plan check fee
Not clearly published for building permits on the reviewed Building Services pages.
03
Permit fee formula
Not clearly published for building permits on the reviewed Building Services pages.
04
Reinspection fee
Land-disturbance and development materials publish a 150 dollar reinspection fee for stormwater construction inspections, but a general building-services reinspection schedule was not clearly posted.

County uses Evolve for online submittals; separate stormwater and land-disturbance pages publish their own review and inspection fee tables where applicable.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • InspectionRequests@DorchesterCountySC.gov (email)
  • 843-832-0011 (phone)
Scheduling deadline
Next-day requests must be made by 3:00 pm the prior business day
Inspection hours
Monday through Friday, 8:30 am to 4:30 pm, excluding holidays

Typical sequence: County page states inspections occur throughout the construction process to verify code compliance; exact sequences depend on permit type.

Source: Dorchester County Building Services ↗

§ 06

Frequently asked

Common questions about unincorporated Dorchester County permits

01 Do I need a building permit in unincorporated Dorchester County, SC?
The county states Building Services is responsible for issuance of residential and commercial building permits for new construction and renovations in unincorporated Dorchester County.
02 How much does a building permit cost in unincorporated Dorchester County, SC?
Building permit fees in unincorporated Dorchester County, SC are set by the local building department and vary by project type and valuation. The minimum permit fee is Not publicly confirmed during this review.. Fees are calculated as: Not clearly published for building permits on the reviewed Building Services pages.. Plan check fee: Not clearly published for building permits on the reviewed Building Services pages..
03 How do I apply for a building permit in unincorporated Dorchester County, SC?
To apply for a building permit in unincorporated Dorchester County, SC, follow these steps: 1. Confirm the property is in unincorporated Dorchester County rather than inside a municipality. 2. Use the county Apply Online page to submit in Evolve, or use the county building application as directed. 3. Follow the county submittal process and upload the required plans and project materials. 4. Complete any floodplain or land-disturbance review steps required for the site. 5. County staff review the submittal for code compliance and issue comments if revisions are needed. 6. After approval, obtain the permit and keep permit documentation on site. 7. Schedule inspections through the county; next-day inspections require contacting the office no later than 3:00 pm the business day before the requested date.
04 How long does it take to get a building permit in unincorporated Dorchester County, SC?
Building permit processing times in unincorporated Dorchester County, SC typically run No general permit-review turnaround was clearly published on the reviewed county building-services pages.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in unincorporated Dorchester County, SC?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Dorchester County, SC via: InspectionRequests@DorchesterCountySC.gov, 843-832-0011. Next-day requests must be made by 3:00 pm the prior business day.
last verified April 2026 source Dorchester County Building Services ↗ entry id permits/south-carolina/dorchester/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Dorchester County Building Services before applying. Jaspector is not legal advice.