jaspector
City building permits

City of Jeannette

How to apply for a building permit in City of Jeannette, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Pennsylvania Uniform Construction Code
Last verified
April 2026
On this page 6
§ 01

Permit authority

Code and Zoning Enforcement Office

Street address
110 S. Second Street, Jeannette, PA 15644
Coverage
City building, zoning, occupancy, rental, sidewalk, signage, demolition, and pool permits within Jeannette.
Online portal
Website Forms Library
Website forms library
§ 02

When a permit is required

Permit triggers and exempt work for Jeannette

The City enforces the PA UCC and zoning rules for accessory structures including pools, fences, sheds, and garages; public forms cover zoning permits, residential building permits, manufactured homes, demolition, sidewalks, signage, swimming pools, and commercial occupancy.

Privacy fence under 6 feet
Residential retaining walls under 4 feet
For owner occupied structures, the City's rental occupancy inspection program does not apply
  • Exempt Privacy fence under 6 feet
  • Exempt Residential retaining walls under 4 feet
  • Exempt For owner occupied structures, the City's rental occupancy inspection program does not apply
Required documents
  • Completed permit form
  • Plans where required
  • Three sets of sealed plans prepared by a licensed architect or engineer for commercial building permits
  • Electrical inspection reports before certificate of occupancy
Building code
Pennsylvania Uniform Construction Code
Contractor requirements
Electrical inspections and fees are the responsibility of the owner or contractor and reports must be submitted to the City building code official; PA home improvement contractor registration rules still apply where applicable.

Source: Code and Zoning Enforcement Office ↗

§ 03

Application process

Typical processing: Rental occupancy requests are typically scheduled through the Tax Office; lien and zoning certificate requests are typically completed within 24 hours of receipt and payment; no general building permit turnaround was published

  1. 01
    Select the correct permit form from the City Forms and Permits page.
  2. 02
    Complete the form and mail or drop it off to City Hall at 110 S. 2nd Street.
  3. 03
    For occupancy inspections, call or stop at the Tax Office to schedule the inspection and pay before inspection.
  4. 04
    For commercial occupancy, contact the Code Enforcement Officer directly before beginning the process because the City notes it can be more detailed.
  5. 05
    The City or Fire Department performs the inspection, issues corrections if needed, and emails the permit or occupancy document once the property passes.

Typical processing time: Rental occupancy requests are typically scheduled through the Tax Office; lien and zoning certificate requests are typically completed within 24 hours of receipt and payment; no general building permit turnaround was published

Source: Code and Zoning Enforcement Office ↗

§ 04

Fee schedule

Effective 2021

Fee type
Amount
01
Minimum permit fee
Examples include above-ground pool $105 plus $20, deck over 30 inches $105 plus $20, demolition $105 plus $20, and commercial plan review $150 plus $30
02
Plan check fee
Commercial building permit plan review fee is $150 plus $30, due at plan submission
03
Permit fee formula
Mixed. Residential examples are flat permit plus flat inspection amounts; commercial new, alteration, and renovation permit fee is total construction cost multiplied by 0.0075 after plan review
04
Reinspection fee
Electrical inspections are extra and paid separately by owner or contractor; no separate public reinspection penalty schedule was found

Jeannette says forms may be mailed or dropped off and occupancy inspection payments can be made in person or by mail; checks should be payable to the City of Jeannette

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2021) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Tax Office (phone)
  • Tax Office (in-person)
Inspection hours
7:30 a.m. to 3:30 p.m. Monday through Friday

Typical sequence: City fee schedule lists footing, foundation, sanitary underground, rough framing, rough plumbing, rough mechanical, energy, drywall, plumbing final, mechanical final, and overall final; electrical rough-in, service, and final are separate third-party reports.

§ 06

Frequently asked

Common questions about Jeannette permits

01 Do I need a building permit in Jeannette, PA?
The City enforces the PA UCC and zoning rules for accessory structures including pools, fences, sheds, and garages; public forms cover zoning permits, residential building permits, manufactured homes, demolition, sidewalks, signage, swimming pools, and commercial occupancy.
02 How much does a building permit cost in Jeannette, PA?
Building permit fees in Jeannette, PA are set by the local building department and vary by project type and valuation. The minimum permit fee is Examples include above-ground pool $105 plus $20, deck over 30 inches $105 plus $20, demolition $105 plus $20, and commercial plan review $150 plus $30. Fees are calculated as: Mixed. Residential examples are flat permit plus flat inspection amounts; commercial new, alteration, and renovation permit fee is total construction cost multiplied by 0.0075 after plan review. Plan check fee: Commercial building permit plan review fee is $150 plus $30, due at plan submission.
03 How do I apply for a building permit in Jeannette, PA?
To apply for a building permit in Jeannette, PA, follow these steps: 1. Select the correct permit form from the City Forms and Permits page. 2. Complete the form and mail or drop it off to City Hall at 110 S. 2nd Street. 3. For occupancy inspections, call or stop at the Tax Office to schedule the inspection and pay before inspection. 4. For commercial occupancy, contact the Code Enforcement Officer directly before beginning the process because the City notes it can be more detailed. 5. The City or Fire Department performs the inspection, issues corrections if needed, and emails the permit or occupancy document once the property passes.
04 How long does it take to get a building permit in Jeannette, PA?
Building permit processing times in Jeannette, PA typically run Rental occupancy requests are typically scheduled through the Tax Office; lien and zoning certificate requests are typically completed within 24 hours of receipt and payment; no general building permit turnaround was published. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Jeannette, PA?
Not all construction work requires a permit in Jeannette, PA. The following work is generally exempt: Privacy fence under 6 feet; Residential retaining walls under 4 feet; For owner occupied structures, the City's rental occupancy inspection program does not apply. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Jeannette, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Jeannette, PA via: Tax Office, Tax Office.
last verified April 2026 source Code and Zoning Enforcement Office ↗ entry id permits/pennsylvania/westmoreland/jeannette

Educational reference. Permit rules and fees change — confirm current requirements directly with Code and Zoning Enforcement Office before applying. Jaspector is not legal advice.