jaspector
§ PA Union County
City building permits

Gregg Township

How to apply for a building permit in Gregg Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Central Keystone Council of Governments (CK-COG), Uniform Construction Code Management / Building Permits

Street address
1610 Industrial Boulevard, Suite 400A, Lewisburg, PA 17837
Coverage
All properties within Gregg Township, Union County. Pennsylvania DLI lists Gregg Township as a UCC opt-in municipality with CK-COG as code enforcement agency. Zoning review is part of the pre-permit process in Gregg Township.
Online portal
CKCOG Fillable PDF Permit Application
Fillable PDF — no public self-service online portal
§ 02

When a permit is required

Permit triggers and exempt work for Gregg Township

UCC permits are required for all new construction; living space additions; attached garages; decks or ramps over 30 inches high; structural roof framing work; in-ground pools and permanent above-ground pools over 24 inches deep; fences over 6 feet; retaining walls 4 feet or higher; detached accessory structures over 1,000 square feet; and renovations affecting egress, load-bearing walls, plumbing, or electrical systems.

Note: No separate Gregg Township exempt-work list was found. Pennsylvania UCC exemptions apply: ordinary repairs not affecting structure, egress, or mechanical/plumbing/gas/electrical systems; finish work such as painting, tiling, and cabinets; prefabricated pools under 24 inches deep and under 5,000 gallons; and agricultural buildings with proper exemption form. Contact CKCOG to confirm whether your specific project requires a permit.

Required documents
  • Completed CKCOG building permit application
  • Construction plans (2 sets residential, 3 sets commercial)
  • Gregg Township zoning approval
  • Municipal and county approvals as applicable (sewage, land development, driveway, floodplain, conservation)
  • Residential energy worksheet for new residential construction
  • Workers compensation proof or owner exemption affidavit if a contractor is involved
  • Commercial plan review deposit ($1,000)
Building code
Pennsylvania Uniform Construction Code under Act 45. The 2021 I-Codes became effective January 1, 2026.
Permit validity
Unpaid UCC applications and permits become abandoned and null and void 1 year after application submission.
Owner-builder
Residential plans may be drawn by the homeowner. Homeowners performing all associated work themselves may sign the CKCOG exemption affidavit in lieu of providing workers compensation coverage.
Contractor requirements
CKCOG requires workers compensation proof or exemption from all contractors. Pennsylvania home improvement contractors performing covered work must register with the Office of Attorney General under HICPA unless they perform less than $5,000 of work in a calendar year.

Source: Central Keystone Council of Governments (CK-COG), Uniform Construction Code Management / Building Permits ↗

§ 03

Application process

Typical processing: Residential review typically takes less than 1 week when complete; Pennsylvania UCC requires residential permits within 15 business days if not returned for corrections. Commercial review takes up to 30 business days.

  1. 01
    Obtain Gregg Township zoning approval and all other required local or county pre-construction approvals.
  2. 02
    Prepare the UCC application, required plans, and supporting documents. Residential applications require two plan sets; commercial applications require three sets and a $1,000 plan review deposit.
  3. 03
    Submit the application to CKCOG by email, mail, or in-person delivery, including workers compensation proof or exemption if a contractor is involved.
  4. 04
    CKCOG reviews the submission and contacts the applicant with permit status and calculated fees.
  5. 05
    Pay the permit fee in full before permit release or inspections.
  6. 06
    Schedule required inspections with CKCOG by phone, email, or fax with at least 24 hours notice (48 hours recommended).
  7. 07
    Obtain the final certificate of occupancy or compliance after all inspections are approved.

Typical processing time: Residential review typically takes less than 1 week when complete; Pennsylvania UCC requires residential permits within 15 business days if not returned for corrections. Commercial review takes up to 30 business days.

Source: Central Keystone Council of Governments (CK-COG), Uniform Construction Code Management / Building Permits ↗

§ 04

Fee schedule

Gregg Township building permit fees

Fee type
Amount
01
Plan check fee
Included in residential permit fees. Commercial submissions require a $1,000 plan review deposit credited toward review and permit charges.
02
Permit fee formula
Residential new work uses CKCOG valuation or hourly-inspection formulas; 2026 residential schedule shows an $83 hourly rate plus a $4.50 state surcharge. Commercial uses: square foot construction cost x area x 0.007.
03
Reinspection fee
Work started before permit issuance is subject to special fees set by the Building Code Official. No Gregg Township-specific general reinspection schedule was found.
04
Penalty (no permit)
Work started before permit issuance triggers special fees set by the Building Code Official.

Payment in full required before permit release or inspections. CKCOG adds a 3% credit card convenience fee. Printing charges may apply for emailed 11x17 residential alteration drawings.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • CKCOG — (570) 522-1326 (phone)
  • Email CKCOG at permits@ckcog.com (online)
Scheduling deadline
Minimum 24 hours notice required; 48 hours recommended.
Time windows
Early AM (8:00–10:00), Late AM (10:00–12:00), Afternoon (1:00–3:00)

Typical sequence: Typical sequence: footer/post hole, foundation, frame and masonry, rough plumbing/mechanical/gas/electrical, insulation, lath/wallboard, and final. Project-specific inspections added as needed.

Source: Central Keystone Council of Governments (CK-COG), Uniform Construction Code Management / Building Permits ↗

§ 06

Frequently asked

Common questions about Gregg Township permits

01 Do I need a building permit in Gregg Township, PA?
UCC permits are required for all new construction; living space additions; attached garages; decks or ramps over 30 inches high; structural roof framing work; in-ground pools and permanent above-ground pools over 24 inches deep; fences over 6 feet; retaining walls 4 feet or higher; detached accessory structures over 1,000 square feet; and renovations affecting egress, load-bearing walls, plumbing, or electrical systems.
02 How much does a building permit cost in Gregg Township, PA?
Building permit fees in Gregg Township, PA are set by the local building department and vary by project type and valuation. Fees are calculated as: Residential new work uses CKCOG valuation or hourly-inspection formulas; 2026 residential schedule shows an $83 hourly rate plus a $4.50 state surcharge. Commercial uses: square foot construction cost x area x 0.007.. Plan check fee: Included in residential permit fees. Commercial submissions require a $1,000 plan review deposit credited toward review and permit charges..
03 How do I apply for a building permit in Gregg Township, PA?
To apply for a building permit in Gregg Township, PA, follow these steps: 1. Obtain Gregg Township zoning approval and all other required local or county pre-construction approvals. 2. Prepare the UCC application, required plans, and supporting documents. Residential applications require two plan sets; commercial applications require three sets and a $1,000 plan review deposit. 3. Submit the application to CKCOG by email, mail, or in-person delivery, including workers compensation proof or exemption if a contractor is involved. 4. CKCOG reviews the submission and contacts the applicant with permit status and calculated fees. 5. Pay the permit fee in full before permit release or inspections. 6. Schedule required inspections with CKCOG by phone, email, or fax with at least 24 hours notice (48 hours recommended). 7. Obtain the final certificate of occupancy or compliance after all inspections are approved.
04 How long does it take to get a building permit in Gregg Township, PA?
Building permit processing times in Gregg Township, PA typically run Residential review typically takes less than 1 week when complete; Pennsylvania UCC requires residential permits within 15 business days if not returned for corrections. Commercial review takes up to 30 business days.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Gregg Township, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Gregg Township, PA via: CKCOG — (570) 522-1326, Email CKCOG at permits@ckcog.com. Minimum 24 hours notice required; 48 hours recommended..

Educational reference. Permit rules and fees change — confirm current requirements directly with Central Keystone Council of Governments (CK-COG), Uniform Construction Code Management / Building Permits before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Union County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Union County jurisdictions →