On this page 5
When a permit is required
Permit triggers and exempt work for Blooming Grove Township
Pennsylvania UCC permit triggers generally apply to new construction, additions, many decks and pools, structural alterations, demolition, change of occupancy, and regulated electrical, plumbing, mechanical, or gas work.
Note: No municipality-specific exempt-work list was located in the reviewed public materials. Confirm any claimed exemption directly with building code official Tim Blaine before proceeding. Pennsylvania UCC baseline exemptions apply.
- Permit application
- Parcel information
- Plans
- Contractor details
- Any triggered zoning, sewage, floodplain, driveway, utility, or planning approvals
- Building code
- Pennsylvania Uniform Construction Code (UCC), effective January 1, 2026 (statewide triennial update). Pennsylvania L&I lists Blooming Grove Township as OPT-IN with local amendments.
- Permit validity
- Verify directly with the active permit issuer; Pennsylvania UCC default commencement and abandonment rules generally apply unless local procedures state otherwise.
- Owner-builder
- Owners may typically apply directly or through an authorized agent, but the permit holder remains responsible for compliance and inspections.
- Contractor requirements
- Pennsylvania home improvement contractors performing covered work over $5,000 must confirm HICPA (Home Improvement Consumer Protection Act) registration requirements.
Source: Blooming Grove Township — Building Code Official: Tim Blaine ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the project is located within Blooming Grove Township and identify any local zoning, floodplain, sewage, driveway, subdivision, or similar approvals required before UCC permit issuance.
- 02 Contact building code official Tim Blaine at (570) 775-6461 to obtain the active application path, current forms, and any local signoff requirements.
- 03 Submit the permit application with parcel information, plans, contractor details, and any triggered supporting approvals.
- 04 Pay the quoted fee and wait for permit issuance before beginning regulated work.
- 05 Schedule required inspections and obtain final approval before occupancy or closeout.
Source: Blooming Grove Township — Building Code Official: Tim Blaine ↗
Required inspections
Scheduling and sequence
- Tim Blaine — (570) 775-6461 (phone)
Typical sequence: Permit issuance, required phase inspections, then final inspection or certificate closeout as applicable. Confirm the required inspection sequence with the issuing code official.
Source: Blooming Grove Township — Building Code Official: Tim Blaine ↗
Frequently asked
Common questions about Blooming Grove Township permits
01 Do I need a building permit in Blooming Grove Township, PA? ▸
02 How do I apply for a building permit in Blooming Grove Township, PA? ▸
03 How do I schedule a building inspection in Blooming Grove Township, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Blooming Grove Township — Building Code Official: Tim Blaine before applying. Jaspector is not legal advice.