On this page 6
When a permit is required
Permit triggers and exempt work for Upper Merion Township
Building, inspection, and other permit applications required by township building and construction codes. Emergency repair/replacement may proceed first only if permit application is filed within 3 business days.
Note: Emergency repair/replacement is the clearest stated exception, subject to filing a permit application within 3 business days. No single comprehensive public exemption list found. Verify with the township.
- Permit application
- Plans
- Additional required documents per project type
- Fees
- Building code
- Pennsylvania UCC with township-adopted 2018 IBC references; Ordinance 2022-881 adopts 2018 IBC under Chapter 69.
- Owner-builder
- Public pages allow owner or contractor submission depending on application type.
- Contractor requirements
- All contractors need to be registered with Upper Merion Township.
Source: Safety and Codes Enforcement / Code Enforcement Department ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Determine permit type from the residential/commercial procedures pages and gather the required application packet.
- 02 Complete the permit form and assemble required plans, supporting documents, and fees.
- 03 Submit the complete packet to the Permits Department at the township building, or by mail with check.
- 04 Township reviews for code compliance and issues the permit when requirements are satisfied.
- 05 Post the permit and request required inspections directly from the assigned building official with at least 24 hours notice.
Source: Safety and Codes Enforcement / Code Enforcement Department ↗
Fee schedule
Upper Merion Township building permit fees
Permit fees are due at time of application submission; township instructs applicants to email the Permits Desk to verify correct fees.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Contact the assigned building official (name, phone, and email shown on issued permit) (phone)
- Scheduling deadline
- 24 hours advance notice requested.
Typical sequence: Depends on discipline; items include footings, pipe bedding, headwalls/endwalls/abutments, third-party final electrical, and use and occupancy-related finals.
Source: Safety and Codes Enforcement / Code Enforcement Department ↗
Frequently asked
Common questions about Upper Merion Township permits
01 Do I need a building permit in Upper Merion Township, PA? ▸
02 How much does a building permit cost in Upper Merion Township, PA? ▸
03 How do I apply for a building permit in Upper Merion Township, PA? ▸
04 How do I schedule a building inspection in Upper Merion Township, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Safety and Codes Enforcement / Code Enforcement Department before applying. Jaspector is not legal advice.