jaspector
City building permits

Upper Merion Township

How to apply for a building permit in Upper Merion Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Safety and Codes Enforcement / Code Enforcement Department

Street address
175 W. Valley Forge Road, Lower Level, King of Prussia, PA 19406
Coverage
Upper Merion Township, including King of Prussia
§ 02

When a permit is required

Permit triggers and exempt work for Upper Merion Township

Building, inspection, and other permit applications required by township building and construction codes. Emergency repair/replacement may proceed first only if permit application is filed within 3 business days.

Note: Emergency repair/replacement is the clearest stated exception, subject to filing a permit application within 3 business days. No single comprehensive public exemption list found. Verify with the township.

Required documents
  • Permit application
  • Plans
  • Additional required documents per project type
  • Fees
Building code
Pennsylvania UCC with township-adopted 2018 IBC references; Ordinance 2022-881 adopts 2018 IBC under Chapter 69.
Owner-builder
Public pages allow owner or contractor submission depending on application type.
Contractor requirements
All contractors need to be registered with Upper Merion Township.

Source: Safety and Codes Enforcement / Code Enforcement Department ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Determine permit type from the residential/commercial procedures pages and gather the required application packet.
  2. 02
    Complete the permit form and assemble required plans, supporting documents, and fees.
  3. 03
    Submit the complete packet to the Permits Department at the township building, or by mail with check.
  4. 04
    Township reviews for code compliance and issues the permit when requirements are satisfied.
  5. 05
    Post the permit and request required inspections directly from the assigned building official with at least 24 hours notice.

Source: Safety and Codes Enforcement / Code Enforcement Department ↗

§ 04

Fee schedule

Upper Merion Township building permit fees

Fee type
Amount
01
Permit fee formula
Fee schedule applies by permit type; verify current calculation with the Permits Desk.

Permit fees are due at time of application submission; township instructs applicants to email the Permits Desk to verify correct fees.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Contact the assigned building official (name, phone, and email shown on issued permit) (phone)
Scheduling deadline
24 hours advance notice requested.

Typical sequence: Depends on discipline; items include footings, pipe bedding, headwalls/endwalls/abutments, third-party final electrical, and use and occupancy-related finals.

Source: Safety and Codes Enforcement / Code Enforcement Department ↗

§ 06

Frequently asked

Common questions about Upper Merion Township permits

01 Do I need a building permit in Upper Merion Township, PA?
Building, inspection, and other permit applications required by township building and construction codes. Emergency repair/replacement may proceed first only if permit application is filed within 3 business days.
02 How much does a building permit cost in Upper Merion Township, PA?
Building permit fees in Upper Merion Township, PA are set by the local building department and vary by project type and valuation. Fees are calculated as: Fee schedule applies by permit type; verify current calculation with the Permits Desk..
03 How do I apply for a building permit in Upper Merion Township, PA?
To apply for a building permit in Upper Merion Township, PA, follow these steps: 1. Determine permit type from the residential/commercial procedures pages and gather the required application packet. 2. Complete the permit form and assemble required plans, supporting documents, and fees. 3. Submit the complete packet to the Permits Department at the township building, or by mail with check. 4. Township reviews for code compliance and issues the permit when requirements are satisfied. 5. Post the permit and request required inspections directly from the assigned building official with at least 24 hours notice.
04 How do I schedule a building inspection in Upper Merion Township, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Upper Merion Township, PA via: Contact the assigned building official (name, phone, and email shown on issued permit). 24 hours advance notice requested..
last verified April 2026 source Safety and Codes Enforcement / Code Enforcement Department ↗ entry id permits/pennsylvania/montgomery/upper-merion-township

Educational reference. Permit rules and fees change — confirm current requirements directly with Safety and Codes Enforcement / Code Enforcement Department before applying. Jaspector is not legal advice.