jaspector
City building permits

Borough of Macungie

How to apply for a building permit in Borough of Macungie, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Borough of Macungie zoning and UCC permitting function

Street address
Borough of Macungie, 21 Locust Street, Macungie, PA 18062
Coverage
All properties within the Borough of Macungie.
Online portal
Borough Forms Page
Borough forms page with downloadable PDF applications
§ 02

When a permit is required

Permit triggers and exempt work for Macungie

The borough publishes separate zoning, building, demolition, electrical, HVAC, plumbing, pool, fence and wall, and shed permit forms, indicating permit review is required for those categories.

Note: Macungie publishes a dedicated UCC exclusions and exceptions PDF rather than restating the exemption list on the forms page.

Required documents
  • Completed permit application
  • Property and contractor information
  • Project description
  • Cost
  • Supporting plans or drawings as applicable
Building code
Pennsylvania Uniform Construction Code, with current PA UCC adoption based on the 2021 ICC series effective January 1, 2026.
Permit validity
Not clearly published on the reviewed forms page.
Owner-builder
The application form allows owner, contractor, or other applicant status to be identified.
Contractor requirements
Contractor information is required on the application. Pennsylvania HICPA registration applies where required. Borough-specific trade licensing was not clearly summarized on the public forms page reviewed.

Source: Borough of Macungie zoning and UCC permitting function ↗

§ 03

Application process

Typical processing: Processing time not clearly published on the public forms page.

  1. 01
    Select the correct Macungie permit form from the borough forms page.
  2. 02
    Complete the zoning and UCC application with owner, applicant, contractor, property, and project information.
  3. 03
    Attach any required drawings, plot plans, trade details, and valuation information.
  4. 04
    Submit the application to the borough for zoning and UCC review.
  5. 05
    Pay the applicable fees and await issuance before starting work.
  6. 06
    Complete required inspections and final approval.

Typical processing time: Processing time not clearly published on the public forms page.

Source: Borough of Macungie zoning and UCC permitting function ↗

§ 04

Fee schedule

Macungie building permit fees

Fee type
Amount
01
Minimum permit fee
Not clearly legible from the public forms page alone.
02
Plan check fee
Not clearly summarized in the public page text reviewed.
03
Permit fee formula
Varies by permit type; borough publishes a fee schedule on the forms page.
04
Reinspection fee
Not clearly summarized in the public page text reviewed.

Not clearly published on the forms page reviewed.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Through the borough after permit issuance (phone)
Inspection hours
Not clearly published on the forms page reviewed.

Typical sequence: Project-specific and trade-specific.

Source: Borough of Macungie zoning and UCC permitting function ↗

§ 06

Frequently asked

Common questions about Macungie permits

01 Do I need a building permit in Macungie, PA?
The borough publishes separate zoning, building, demolition, electrical, HVAC, plumbing, pool, fence and wall, and shed permit forms, indicating permit review is required for those categories.
02 How much does a building permit cost in Macungie, PA?
Building permit fees in Macungie, PA are set by the local building department and vary by project type and valuation. The minimum permit fee is Not clearly legible from the public forms page alone.. Fees are calculated as: Varies by permit type; borough publishes a fee schedule on the forms page.. Plan check fee: Not clearly summarized in the public page text reviewed..
03 How do I apply for a building permit in Macungie, PA?
To apply for a building permit in Macungie, PA, follow these steps: 1. Select the correct Macungie permit form from the borough forms page. 2. Complete the zoning and UCC application with owner, applicant, contractor, property, and project information. 3. Attach any required drawings, plot plans, trade details, and valuation information. 4. Submit the application to the borough for zoning and UCC review. 5. Pay the applicable fees and await issuance before starting work. 6. Complete required inspections and final approval.
04 How long does it take to get a building permit in Macungie, PA?
Building permit processing times in Macungie, PA typically run Processing time not clearly published on the public forms page.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Macungie, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Macungie, PA via: Through the borough after permit issuance.
last verified April 2026 source Borough of Macungie zoning and UCC permitting function ↗ entry id permits/pennsylvania/lehigh/macungie

Educational reference. Permit rules and fees change — confirm current requirements directly with Borough of Macungie zoning and UCC permitting function before applying. Jaspector is not legal advice.