On this page 6
When a permit is required
Permit triggers and exempt work for Grove Township
Same Jones permit sequence and county zoning approval rules.
- Exempt Fences not over 6 feet high
- Exempt Retaining walls not over 4 feet unless supporting surcharge
- Exempt Water tanks on grade up to 5,000 gallons
- Exempt Sidewalks and driveways not over basements
- Exempt Shallow prefabricated pools
- Exempt Playground equipment
- Exempt Certain window awnings
- Exempt Certain low decks
Note: State UCC residential exemptions apply on the building permit side; zoning and floodplain approvals may still be required.
- Application
- Plot plan
- Two sets of construction drawings
- County zoning approval
- Sewage or sewer approval
- E and S or stormwater permits if required
- Road occupancy permit if required
- Workers compensation evidence where applicable
- Building code
- Pennsylvania Uniform Construction Code; Cameron County zoning and floodplain ordinances.
- Permit validity
- Pennsylvania UCC 180 day start and inactivity rules.
- Owner-builder
- No Grove-specific rule found.
- Contractor requirements
- Pennsylvania HICPA registration where required; workers compensation documentation where applicable.
Application process
Typical processing: 30 business day state rule for complete applications.
- 01 Sewage or sewer approval first.
- 02 Cameron County zoning and floodplain approval second.
- 03 Jones Township UCC application third, with plans and all required supporting approvals.
- 04 Pay plan review and permit fees.
- 05 Receive permit and keep placard and plans on site.
- 06 Schedule and pass required inspections.
Typical processing time: 30 business day state rule for complete applications.
Fee schedule
Grove Township building permit fees
Jones checks payable to Jones Township.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 814-929-5138 or 814-594-6194 (phone)
- Scheduling deadline
- 48 hours notice required.
- Time windows
- Only footer inspections receive a specific appointment time.
Typical sequence: Footer, foundation, framing with rough trades, energy, wallboard if required, sanitary approval, then final inspection and certificate of occupancy where applicable.
Frequently asked
Common questions about Grove Township permits
01 Do I need a building permit in Grove Township, PA? ▸
02 How much does a building permit cost in Grove Township, PA? ▸
03 How do I apply for a building permit in Grove Township, PA? ▸
04 How long does it take to get a building permit in Grove Township, PA? ▸
05 What work is exempt from building permits in Grove Township, PA? ▸
06 How do I schedule a building inspection in Grove Township, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Jones Township Building Code Department for UCC building permits; Cameron County Zoning Office for zoning and floodplain; Grove Township secretary for local township contact before applying. Jaspector is not legal advice.