On this page 5
When a permit is required
Permit triggers and exempt work for Condon
Building permits required for new construction and qualifying alterations within City of Condon
- Exempt Accessory structures (sheds, detached garages): nonhabitable, one-story, under 200 sq ft, roof height under 15 ft
- Exempt Patios, porches, deck covers: under 200 sq ft area, average roof height under 12 ft, at least 3 ft from property lines
- Exempt Decks/porches: floor or deck 30 inches or less above adjacent grade
- Exempt Fences: wood, wire mesh, or chain link under 7 ft in height
- Exempt Plumbing repairs/replacements: sink, toilet, faucet not concealed in wall
- Exempt Countertops, shower heads, gutters, downspouts
Note: Exempt from building permit does not mean exempt from local zoning and planning requirements; confirm with Planning Department before proceeding
- Development Permit Application form
- Site plan and drawings per city code
- Construction and development details
- Building code
- Oregon Structural Specialty Code, Oregon Residential Specialty Code, Oregon Mechanical Specialty Code, Oregon Plumbing Specialty Code, Oregon Electrical Specialty Code
- Permit validity
- Permit expires if work not started within 180 days; expires if work suspended or abandoned for 180+ days
- Contractor requirements
- Contractors must hold valid Oregon CCB license, surety bond, public liability and property damage insurance
Application process
Typical processing: Varies; contact Planning Department for specific timeline
- 01 Download Development Permit Application from City of Condon website
- 02 Prepare site plan and construction drawings per city code requirements
- 03 Submit completed application and documents to City of Condon Planning Department
- 04 City reviews application for completeness and compliance with local ordinances
- 05 City bills applicant for any administration costs (materials, consultants, legal review)
- 06 Upon approval, obtain permit and begin work within permit validity period
Typical processing time: Varies; contact Planning Department for specific timeline
Required inspections
Scheduling and sequence
- Inspection hours
- Monday-Thursday 8 AM-5 PM; Friday 8 AM-4 PM
Frequently asked
Common questions about Condon permits
01 Do I need a building permit in Condon, OR? ▸
02 How do I apply for a building permit in Condon, OR? ▸
03 How long does it take to get a building permit in Condon, OR? ▸
04 What work is exempt from building permits in Condon, OR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Condon Planning Department before applying. Jaspector is not legal advice.