§ 01

Permit authority

Douglas County Building Department (on behalf of City of Roseburg)

Street address
1036 SE Douglas Avenue, Justice Building Room 106, Roseburg, OR 97470
Coverage
All properties within the incorporated City of Roseburg limits.
§ 02

When a permit is required

Permit triggers and exempt work for Roseburg

A construction permit is required prior to beginning construction, alteration, or repair of a structure, except ordinary repairs.

Ordinary repairs exempt from permit requirements
Sheds/storage buildings under 200 sq ft with average roof height under 10 ft
  • Exempt Ordinary repairs exempt from permit requirements
  • Exempt Sheds/storage buildings under 200 sq ft with average roof height under 10 ft
Required documents
  • Completed application with approved worksheet
  • Construction plans (two sets for residential, three sets for commercial)
Building code
Oregon statewide codes (ORSC, OSSC, specialty codes)
Permit validity
Permit valid for 180 days from issuance; work must begin within that period.
Contractor requirements
Licensed contractors can apply directly online; homeowners should contact building department for authorization.
§ 03

Application process

Typical processing: 10+ working days for initial plan review; total issuance time longer if revisions or agency approvals required.

  1. 01
    Submit complete application with approved worksheet and construction plans to Douglas County Building Division.
  2. 02
    For residential: two sets of construction plans; for commercial: three sets.
  3. 03
    Initial plan review takes ten working days.
  4. 04
    Respond to plan revisions or approvals from interested agencies.
  5. 05
    Receive permit and begin construction within 180 days of issuance.

Typical processing time: 10+ working days for initial plan review; total issuance time longer if revisions or agency approvals required.

Source: Douglas County Building Department (on behalf of City of Roseburg) ↗

§ 04

Fee schedule

Roseburg building permit fees

Fee type
Amount
01
Permit fee formula
Basic fee schedule established by State of Oregon Building Codes Division. Total permit fee based on accumulated discipline fees (building, mechanical, plumbing, electrical) plus 12% state surcharge.

Contact office for estimated fees and current fee schedule.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (541) 440-4559 (phone)
Inspection hours
Monday-Friday, 8:00 AM to 5:00 PM (closed 12:00 PM - 1:00 PM). Inspectors available 3:00 PM - 4:00 PM.
§ 06

Frequently asked

Common questions about Roseburg permits

01 Do I need a building permit in Roseburg, OR?
A construction permit is required prior to beginning construction, alteration, or repair of a structure, except ordinary repairs.
02 How much does a building permit cost in Roseburg, OR?
Building permit fees in Roseburg, OR are set by the local building department and vary by project type and valuation. Fees are calculated as: Basic fee schedule established by State of Oregon Building Codes Division. Total permit fee based on accumulated discipline fees (building, mechanical, plumbing, electrical) plus 12% state surcharge..
03 How do I apply for a building permit in Roseburg, OR?
To apply for a building permit in Roseburg, OR, follow these steps: 1. Submit complete application with approved worksheet and construction plans to Douglas County Building Division. 2. For residential: two sets of construction plans; for commercial: three sets. 3. Initial plan review takes ten working days. 4. Respond to plan revisions or approvals from interested agencies. 5. Receive permit and begin construction within 180 days of issuance.
04 How long does it take to get a building permit in Roseburg, OR?
Building permit processing times in Roseburg, OR typically run 10+ working days for initial plan review; total issuance time longer if revisions or agency approvals required.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Roseburg, OR?
Not all construction work requires a permit in Roseburg, OR. The following work is generally exempt: Ordinary repairs exempt from permit requirements; Sheds/storage buildings under 200 sq ft with average roof height under 10 ft. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Roseburg, OR?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Roseburg, OR via: (541) 440-4559.
last verified April 2026 source Douglas County Building Department (on behalf of City of Roseburg) ↗ entry id permits/oregon/douglas/roseburg

Educational reference. Permit rules and fees change — confirm current requirements directly with Douglas County Building Department (on behalf of City of Roseburg) before applying. Jaspector is not legal advice.