City of Wilsonville

How to apply for a building permit in City of Wilsonville, Oregon. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Wilsonville Building Division

Street address
Wilsonville City Hall, 29799 SW Town Center Loop E, Wilsonville, OR 97070
Coverage
Wilsonville runs its own building division for property inside city limits, including the part of the city in Clackamas County. The city page routes electrical permit submittals to Clackamas County Online ePermitting. Planning, engineering, and public works approvals may also apply.
Online portal
Wilsonville Online Permitting Portal
Wilsonville Online Permitting and Licensing Portal
§ 02

When a permit is required

Permit triggers and exempt work for Wilsonville

Permits required for most new construction and regulated structural or trade work.

State residential exemptions for listed minor work, subject to Wilsonville planning and engineering review where applicable
  • Exempt State residential exemptions for listed minor work, subject to Wilsonville planning and engineering review where applicable
Required documents
  • Application
  • Plans
  • Project-specific forms or handouts
Building code
Current Oregon specialty codes enforced by the city; electrical permit intake is directed through Clackamas County Online ePermitting.
Permit validity
Oregon 180-day rule generally applies unless extended.
Owner-builder
Standard Oregon owner-builder rules apply.
Contractor requirements
Oregon CCB licensing applies.
§ 03

Application process

Typical processing: No universal public turnaround posted on the main page.

  1. 01
    Review Wilsonville building forms, permit packets, and applicable local review requirements.
  2. 02
    Submit most building, plumbing, mechanical, and fire permit materials through the Wilsonville online portal and electronic plan review path.
  3. 03
    Route electrical permit submittals through Clackamas County Online ePermitting as directed by the city.
  4. 04
    Pay review fees and respond to plan review comments until approval.
  5. 05
    Receive permit issuance, schedule inspections with the correct authority, and obtain finals.

Typical processing time: No universal public turnaround posted on the main page.

Source: City of Wilsonville Building Division ↗

§ 04

Fee schedule

Wilsonville building permit fees

Fee type
Amount
01
Minimum permit fee
See current Wilsonville fee tables
02
Plan check fee
Per current city fee schedule.
03
Permit fee formula
Structural permit fees are valuation-based; city page and fee PDF indicate separate schedules for local permits, while electrical intake follows the county-hosted ePermitting path.
04
Reinspection fee
Per current city fee schedule and inspection policies.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Business hours

Typical sequence: Site/footing, framing, rough trades, cover inspections, finals, with electrical coordinated through the city-linked county-hosted intake path.

§ 06

Frequently asked

Common questions about Wilsonville permits

01 Do I need a building permit in Wilsonville, OR?
Permits required for most new construction and regulated structural or trade work.
02 How much does a building permit cost in Wilsonville, OR?
Building permit fees in Wilsonville, OR are set by the local building department and vary by project type and valuation. The minimum permit fee is See current Wilsonville fee tables. Fees are calculated as: Structural permit fees are valuation-based; city page and fee PDF indicate separate schedules for local permits, while electrical intake follows the county-hosted ePermitting path.. Plan check fee: Per current city fee schedule..
03 How do I apply for a building permit in Wilsonville, OR?
To apply for a building permit in Wilsonville, OR, follow these steps: 1. Review Wilsonville building forms, permit packets, and applicable local review requirements. 2. Submit most building, plumbing, mechanical, and fire permit materials through the Wilsonville online portal and electronic plan review path. 3. Route electrical permit submittals through Clackamas County Online ePermitting as directed by the city. 4. Pay review fees and respond to plan review comments until approval. 5. Receive permit issuance, schedule inspections with the correct authority, and obtain finals.
04 How long does it take to get a building permit in Wilsonville, OR?
Building permit processing times in Wilsonville, OR typically run No universal public turnaround posted on the main page.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Wilsonville, OR?
Not all construction work requires a permit in Wilsonville, OR. The following work is generally exempt: State residential exemptions for listed minor work, subject to Wilsonville planning and engineering review where applicable. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Wilsonville, OR?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Wilsonville, OR via: City inspection information and building staff, City-linked county-hosted ePermitting for electrical.