On this page 6
When a permit is required
Permit triggers and exempt work for Allen County
Permit required when construction, enlargement, alteration, repair, relocation, or change of occupancy is performed on a building or structure, subject to listed exceptions.
- Exempt Detached storage shed under 120 square feet
- Exempt Patio flat on the ground
- Exempt Residential cabinets
- Exempt Backyard recreational play equipment
- Exempt Gutters
- Exempt Minor electrical repair work limited to listed switch, socket, fixture, portable equipment, low-voltage, and certain HVAC replacement items
- Plans and specifications for commercial work
- Residential plans for new construction and additions
- Zoning approval for work outside Lima
- Property owner authorization for non-owner applicants
- Building code
- Ohio Building Code for commercial work; Residential Code of Ohio for one-, two-, and three-family dwellings in the City of Lima. The county department guideline page states it enforces OBC in Allen County.
- Owner-builder
- Written permission from the owner is required if the applicant is not the owner.
- Contractor requirements
- Electrical, HVAC, plumbing, and trade work require the applicable permits; plumbing is handled by the Allen County Health Department.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm whether the work is structural, electrical, mechanical, fire protection, or plumbing.
- 02 Obtain zoning approval from the local zoning authority before applying for a building permit outside Lima.
- 03 Prepare plans and specifications for plan review.
- 04 Submit the permit application and payment to the Building Department.
- 05 Receive approved plans and permit, then schedule inspections through the department.
Fee schedule
Allen County building permit fees
Required inspections
Scheduling and sequence
- By phone (phone)
- By email (email)
- Inspection hours
- Monday through Friday, 11:00 a.m. to 3:00 p.m.; appointments may be scheduled outside window hours by calling 419-998-5541.
Typical sequence: Typical sequence: site setbacks, excavation, foundation/reinforcing, slab, framing, insulation, above-ceiling, final, then certificate of occupancy after all trade permits are approved.
Frequently asked
Common questions about unincorporated Allen County permits
01 Do I need a building permit in unincorporated Allen County, OH? ▸
02 How much does a building permit cost in unincorporated Allen County, OH? ▸
03 How do I apply for a building permit in unincorporated Allen County, OH? ▸
04 What work is exempt from building permits in unincorporated Allen County, OH? ▸
05 How do I schedule a building inspection in unincorporated Allen County, OH? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Lima / Allen County Building Department before applying. Jaspector is not legal advice.