City of Rutland

How to apply for a building permit in City of Rutland, North Dakota. Permit authority, application steps, fees, and inspection requirements.

Avg processing
14-30 days
Last verified
April 2026
On this page 5
§ 01

Permit authority

City of Rutland

Street address
115 Gay Street, Rutland, ND 58067
Coverage
All properties within the incorporated City of Rutland.
Online portal
Forms and Applications
In-person application at City Hall
§ 02

When a permit is required

Permit triggers and exempt work for Rutland

Building permits required for: new homes/construction, garages, sheds and outbuildings, enlarged/expanded decks, fences.

Decks within existing footprint (same size)
Roof replacement
Siding replacement
Window replacement
  • Exempt Decks within existing footprint (same size)
  • Exempt Roof replacement
  • Exempt Siding replacement
  • Exempt Window replacement
Required documents
  • Completed permit application
  • Grid diagram of building placement
Building code
2023 North Dakota State Building Code (based on IBC and IRC)
§ 03

Application process

Typical processing: 14-30 days

  1. 01
    Download building permit application form from rutlandnd.com/forms-and-applications
  2. 02
    Complete application in full with grid diagram of building placement
  3. 03
    Submit form with appropriate fee to City Hall at 115 Gay Street
  4. 04
    Allow minimum 14-30 days for permit approval
  5. 05
    Schedule inspections before final approval

Typical processing time: 14-30 days

Source: City of Rutland ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • City Auditor (701-724-3081) (phone)
Inspection hours
Tuesday and Thursday: 10:00 AM - 2:00 PM; First Monday of month: 10:00 AM - 5:00 PM; After City Council meeting: approximately 6:00-7:00 PM

Typical sequence: Final inspection required before structure use or occupancy.

§ 05

Frequently asked

Common questions about Rutland permits

01 Do I need a building permit in Rutland, ND?
Building permits required for: new homes/construction, garages, sheds and outbuildings, enlarged/expanded decks, fences.
02 How do I apply for a building permit in Rutland, ND?
To apply for a building permit in Rutland, ND, follow these steps: 1. Download building permit application form from rutlandnd.com/forms-and-applications 2. Complete application in full with grid diagram of building placement 3. Submit form with appropriate fee to City Hall at 115 Gay Street 4. Allow minimum 14-30 days for permit approval 5. Schedule inspections before final approval
03 How long does it take to get a building permit in Rutland, ND?
Building permit processing times in Rutland, ND typically run 14-30 days. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Rutland, ND?
Not all construction work requires a permit in Rutland, ND. The following work is generally exempt: Decks within existing footprint (same size); Roof replacement; Siding replacement; Window replacement. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Rutland, ND?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Rutland, ND via: City Auditor (701-724-3081).
last verified April 2026 source City of Rutland ↗ entry id permits/north-dakota/sargent/rutland

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Rutland before applying. Jaspector is not legal advice.