How to apply for a building permit in unincorporated Oliver County, North Dakota. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Oliver County Board of County Commissioners and Planning & Zoning Commission

Street address
Oliver County Courthouse, Center, ND
Coverage
All unincorporated properties in Oliver County, exclusive of incorporated cities or areas under their extended zoning jurisdiction.
Online portal
Building & Zoning Permit Applications
County Website
§ 02

When a permit is required

Permit triggers and exempt work for Oliver County

All structures in unincorporated Oliver County require a permit, whether farm exempt or not.

Note: No blanket exemptions. All structures in unincorporated Oliver County require a permit, even those that may be farm-exempt under state law.

Required documents
  • Completed permit application
  • Scale drawing with structure dimensions and lot lines
  • Site plan showing setbacks and boundary lines
  • Names and addresses of adjacent property owners
  • Erosion and Sediment Control Plan (if applicable for substantial land modification)
  • Performance Bond authorization (if required by Board of County Commissioners)
  • Sewer and water installer certification (if applicable for septic systems)
Building code
North Dakota State Building Code (2023 edition; effective January 1, 2026). Oliver County Revised Zoning Ordinance (2024).

Source: Oliver County Board of County Commissioners and Planning & Zoning Commission ↗

§ 03

Application process

Typical processing: Minimum 3 weeks if public notice required; variable for standard permits depending on meeting schedule.

  1. 01
    Complete Oliver County building/zoning permit application form
  2. 02
    Prepare scale drawing showing structure dimensions, lot lines, setbacks, and distance from lot lines
  3. 03
    Collect names and addresses of adjacent property owners
  4. 04
    Gather additional documentation as required (erosion/sediment control plan, performance bond authorization, sewer/water certification)
  5. 05
    Submit application and all required documents to Oliver County Courthouse
  6. 06
    Application reviewed by Planning & Zoning Commission (meets 4th Thursday of month, tentatively)
  7. 07
    For Conditional Use, Zoning Change, or Ordinance Amendments: application must be received minimum three weeks prior to next Planning & Zoning meeting for proper two-week public notice
  8. 08
    County Commission reviews Planning & Zoning recommendation and votes on permit
  9. 09
    Schedule inspections upon approval
  10. 10
    Proceed with construction

Typical processing time: Minimum 3 weeks if public notice required; variable for standard permits depending on meeting schedule.

Source: Oliver County Board of County Commissioners and Planning & Zoning Commission ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (701) 794-8777 (phone)

Typical sequence: Standard sequence: Footing and Foundation Inspections (prior to concrete placement or backfilling), Structural Framing Inspections (before wall closure), Final Inspection (prior to occupancy), Special Inspections for erosion control measures and drainage systems as required.

§ 05

Frequently asked

Common questions about unincorporated Oliver County permits

01 Do I need a building permit in unincorporated Oliver County, ND?
All structures in unincorporated Oliver County require a permit, whether farm exempt or not.
02 How do I apply for a building permit in unincorporated Oliver County, ND?
To apply for a building permit in unincorporated Oliver County, ND, follow these steps: 1. Complete Oliver County building/zoning permit application form 2. Prepare scale drawing showing structure dimensions, lot lines, setbacks, and distance from lot lines 3. Collect names and addresses of adjacent property owners 4. Gather additional documentation as required (erosion/sediment control plan, performance bond authorization, sewer/water certification) 5. Submit application and all required documents to Oliver County Courthouse 6. Application reviewed by Planning & Zoning Commission (meets 4th Thursday of month, tentatively) 7. For Conditional Use, Zoning Change, or Ordinance Amendments: application must be received minimum three weeks prior to next Planning & Zoning meeting for proper two-week public notice 8. County Commission reviews Planning & Zoning recommendation and votes on permit 9. Schedule inspections upon approval 10. Proceed with construction
03 How long does it take to get a building permit in unincorporated Oliver County, ND?
Building permit processing times in unincorporated Oliver County, ND typically run Minimum 3 weeks if public notice required; variable for standard permits depending on meeting schedule.. Timelines can vary based on project complexity and current department workload.
04 How do I schedule a building inspection in unincorporated Oliver County, ND?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Oliver County, ND via: (701) 794-8777.
last verified April 2026 source Oliver County Board of County Commissioners and Planning & Zoning Commission ↗ entry id permits/north-dakota/oliver/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Oliver County Board of County Commissioners and Planning & Zoning Commission before applying. Jaspector is not legal advice.