On this page 5
When a permit is required
Permit triggers and exempt work for Carrington
All construction projects require a building permit (residential and commercial). Demolition and removal of buildings require a Demolition Permit.
- Exempt Non-heated/cooled buildings (verify with city).
- Exempt Temporary structures (verify with city).
- Exempt Cosmetic work (verify with city).
Note: Verify all exemptions with Carrington Building Permits and Inspections Department before proceeding. Standard North Dakota exemptions apply.
- Building code
- 2024 International Building Code (IBC) and International Residential Code (IRC) effective January 1, 2026.
- Contractor requirements
- Contractors must be licensed/qualified where required by state (electrical, plumbing, etc.). City requires contractor signature on permits before issuance.
Application process
Application → plan check → issuance → inspection → final
- 01 Download Building Permit Application or Demolition Permit Application from city forms page, or request from the city.
- 02 Submit application with plans and required information.
- 03 Contractor signature required (mandatory before permit issuance).
- 04 City review and approval.
- 05 Payment of fees.
- 06 Permit issuance.
Required inspections
Scheduling and sequence
Typical sequence: The Building Permits and Inspections Department is responsible for conducting inspections of all construction-related permits.
Frequently asked
Common questions about Carrington permits
01 Do I need a building permit in Carrington, ND? ▸
02 How do I apply for a building permit in Carrington, ND? ▸
03 What work is exempt from building permits in Carrington, ND? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Permits and Inspections Department before applying. Jaspector is not legal advice.