On this page 5
When a permit is required
Permit triggers and exempt work for Lincoln
Accessory building use permit required for any accessory building over 120 sq ft. Concrete permit required when widening a driveway or adding a camper pad. Basement finishing and deck permits processed by Burleigh County. Contact the city for other project types.
Note: Not published in available public sources. For items handled by Burleigh County, see the Burleigh County section. Contact the city for Lincoln-specific exemptions.
- Building code
- Not confirmed from available public sources. As a city in North Dakota, Lincoln is subject to the ND State Building Code if it has elected to adopt and enforce building codes. Contact the city for confirmation.
- Permit validity
- Likely follows the ND State Building Code (IBC Section 105.5): 180-day commencement window, 180-day abandonment rule. Contact the city for confirmation.
- Contractor requirements
- All work in the City Right of Way must be performed by a contractor licensed and bonded with the City of Lincoln. State contractor license required for jobs over $4,000 (ND Secretary of State).
Application process
Typical processing: Not published.
- 01 Determine which permit type applies to your project.
- 02 For accessory buildings over 120 sq ft: contact City of Lincoln at (701) 258-7969 for an accessory building use permit.
- 03 For concrete work (widening a driveway, adding a camper pad): contact City of Lincoln for a concrete permit. All work in the city right-of-way requires a contractor licensed and bonded with the City of Lincoln.
- 04 For basement finishing or deck permits: contact Burleigh County Building/Planning/Zoning at (701) 221-3727 -- these are not handled by the City of Lincoln.
- 05 For variance applications: contact City of Lincoln.
- 06 For other project types: contact the city at (701) 258-7969 to determine jurisdiction and process.
Typical processing time: Not published.
Source: City of Lincoln Administration / Engineering Department ↗
Required inspections
Scheduling and sequence
- (701) 258-7969 (phone)
- Inspection hours
- City office hours not confirmed. Call (701) 258-7969. For permits routed to Burleigh County (basement, decks): Monday-Friday, 10:00 a.m. - 4:00 p.m.
Typical sequence: Not published for city-issued permits. Burleigh County-issued permits follow the county inspection process.
Frequently asked
Common questions about Lincoln permits
01 Do I need a building permit in Lincoln, ND? ▸
02 How do I apply for a building permit in Lincoln, ND? ▸
03 How long does it take to get a building permit in Lincoln, ND? ▸
04 How do I schedule a building inspection in Lincoln, ND? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Lincoln Administration / Engineering Department before applying. Jaspector is not legal advice.