jaspector
City building permits

City of Bottineau

How to apply for a building permit in City of Bottineau, North Dakota. Permit authority, application steps, fees, and inspection requirements.

Avg processing
10 working days
Min. permit fee
$50.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Bottineau Building Department / City Auditor & Building Inspector

Street address
115 West 6th Street (City Armory), Bottineau, ND 58318
Coverage
Within Bottineau city limits. Electrical permits are issued by the ND State Electrical Board; plumbing permits are issued by the ND State Plumbing Board.
§ 02

When a permit is required

Permit triggers and exempt work for Bottineau

All new construction, additions, fencing, decks, sheds. Permits required for structural work, mechanical installations, and any change in use. Strict setback, lot line distance, and zoning type requirements apply.

Painting and finish work
Reroofing (shingles only)
Concrete patios and flat work
  • Exempt Painting and finish work
  • Exempt Reroofing (shingles only)
  • Exempt Concrete patios and flat work

Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm edge cases with the Building Inspector before proceeding.

Required documents
  • Completed permit application
  • Blueprints or sketches showing proposed structure on lot with setback measurements
Building code
2024 IBC/IRC/IMC/IFGC/IECC/IEBC with North Dakota amendments (effective January 1, 2026). City of Bottineau enforces zoning ordinance (Chapter 6, City of Bottineau Municipal Code, available at https://bottineau.govoffice.com under Ordinances).
Contractor requirements
State contractor license required for hired construction over $4,000 (ND Secretary of State). Separate ND State Electrical Board license required for electrical work; ND State Plumbing Board license for plumbing.
§ 03

Application process

Typical processing: 10 working days

  1. 01
    Submit a building permit application at City Hall (115 West 6th Street), along with blueprints or sketches showing proposed structure and its placement on the lot, including distances from lot lines.
  2. 02
    Application is reviewed by the Planning Commission, Mayor, and City Auditor & Building Inspector.
  3. 03
    Allow 10 working days for permit approval.
  4. 04
    Pay permit fee upon approval (minimum $50.00).
  5. 05
    Post permit at job site.
  6. 06
    Schedule inspections with the Building Inspector.

Typical processing time: 10 working days

Source: City of Bottineau Building Department / City Auditor & Building Inspector ↗

§ 04

Fee schedule

Bottineau building permit fees

Fee type
Amount
01
Minimum permit fee
$50.00
02
Permit fee formula
Depends on construction type

No publicly posted graduated fee schedule found. Contact City Hall at 701-228-3232 for specific project fee estimates. Payment made in-person at City Hall upon permit approval.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 701-228-3232 (phone)
Inspection hours
Monday–Friday, 9:00 a.m. to 12:00 p.m. (noon), or by appointment

Typical sequence: Varies by project. Contact Building Inspector for project-specific requirements.

§ 06

Frequently asked

Common questions about Bottineau permits

01 Do I need a building permit in Bottineau, ND?
All new construction, additions, fencing, decks, sheds. Permits required for structural work, mechanical installations, and any change in use. Strict setback, lot line distance, and zoning type requirements apply.
02 How much does a building permit cost in Bottineau, ND?
Building permit fees in Bottineau, ND are set by the local building department and vary by project type and valuation. The minimum permit fee is $50.00. Fees are calculated as: Depends on construction type.
03 How do I apply for a building permit in Bottineau, ND?
To apply for a building permit in Bottineau, ND, follow these steps: 1. Submit a building permit application at City Hall (115 West 6th Street), along with blueprints or sketches showing proposed structure and its placement on the lot, including distances from lot lines. 2. Application is reviewed by the Planning Commission, Mayor, and City Auditor & Building Inspector. 3. Allow 10 working days for permit approval. 4. Pay permit fee upon approval (minimum $50.00). 5. Post permit at job site. 6. Schedule inspections with the Building Inspector.
04 How long does it take to get a building permit in Bottineau, ND?
Building permit processing times in Bottineau, ND typically run 10 working days. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Bottineau, ND?
Not all construction work requires a permit in Bottineau, ND. The following work is generally exempt: Painting and finish work; Reroofing (shingles only); Concrete patios and flat work. Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm edge cases with the Building Inspector before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Bottineau, ND?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bottineau, ND via: 701-228-3232.
last verified April 2026 source City of Bottineau Building Department / City Auditor & Building Inspector ↗ entry id permits/north-dakota/bottineau/bottineau-city

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Bottineau Building Department / City Auditor & Building Inspector before applying. Jaspector is not legal advice.