When a permit is required
Permit triggers and exempt work for Billings County
A Zoning Certificate and Building Permit are required before starting any new construction, moving or relocating structures, altering external building dimensions, changing property use, or subdividing land.
- Exempt Agricultural activities generally do not require a zoning certificate (confirm with office for specific situations)
- Exempt Work exempt from building permit may still require zoning compliance
Note: Farming exemption applies per zoning ordinance, but confirm with the office at 701-623-4810. Any construction within Theodore Roosevelt National Park South Unit boundary requires NPS jurisdiction, not county permits.
- Completed Application for Building & Zoning Certificate
- Residential or Commercial Plan Submittal Requirements checklist
- Site plan
- Weed Control Plan (for new residential, commercial, or industrial development)
- Approach Permit (if new driveway required)
- Septic/wastewater permit from Southwestern District Health Unit (if applicable)
- Project description and construction plans
- Building code
- North Dakota State Building Code (based on 2024 editions of IBC, IRC, IMC, IFGC, IECC, IEBC; effective January 1, 2026)
- Permit validity
- Governed by adopted International Codes; typically 180 days from issuance. Confirm with office at 701-260-5373.
- Contractor requirements
- North Dakota state contractor license required for construction projects where the cost, value, or price exceeds $4,000. License classes: Class A (over $500,000), Class B (up to $500,000), Class C (up to $300,000), Class D (up to $100,000). Apply through ND Secretary of State FirstStop Portal.
Application process
Typical processing: Approximately two weeks for applications without public hearings. At least six to eight weeks for applications requiring public hearings.
- 01 Verify parcel ownership and zoning district using the parcel data viewer and Zoning District Map.
- 02 Confirm that the proposed land use is permitted outright in the zoning district, or determine whether a Special Conditional Use Permit or Variance is required.
- 03 If a new driveway or road access is needed, obtain an Approach Permit from the Billings County Highway Department.
- 04 If on-site wastewater/septic is needed, obtain a permit from the Southwestern District Health Unit before submitting a building permit application.
- 05 Download and complete the Application for Building & Zoning Certificate and Weed Control Plan (if applicable).
- 06 For commercial projects, complete the Commercial Plan Submittal Requirements checklist. For residential, use the Residential Plan Submittal Requirements checklist.
- 07 Submit the complete application package to the Planning & Zoning office in person or by mail.
- 08 Upon acceptance, a reference number is assigned and the package is transmitted to the Building Department.
- 09 For applications requiring public hearings: The application is scheduled before the Zoning Board (monthly on Thursdays at 1:00 p.m.). Applications are due by 4:00 p.m. approximately three weeks before the meeting date.
- 10 For standard building/zoning certificates: Review typically takes approximately two weeks.
- 11 Pick up the permit from the Building Department and keep the permit package on-site throughout construction.
- 12 Call the Building Department inspection line at 701-842-2120 to schedule inspections.
- 13 Obtain all required final approvals before occupying the structure.
Typical processing time: Approximately two weeks for applications without public hearings. At least six to eight weeks for applications requiring public hearings.
Required inspections
Scheduling and sequence
- 701-842-2120 (inspection scheduling line) (phone)
- 701-260-5373 (general building inquiries) (phone)
- Scheduling deadline
- The earliest available first inspection is one business day after the inspection request is made.
- Inspection hours
- Monday through Friday, 8:30 a.m. to 4:30 p.m. (Central Time). Inspectors are not available on weekends or holidays.
Typical sequence: Typical inspection sequence not publicly documented. Confirm required sequence with Building Department at 701-260-5373.
Frequently asked
Common questions about unincorporated Billings County permits
01 Do I need a building permit in unincorporated Billings County, ND? ▸
02 How do I apply for a building permit in unincorporated Billings County, ND? ▸
03 How long does it take to get a building permit in unincorporated Billings County, ND? ▸
04 What work is exempt from building permits in unincorporated Billings County, ND? ▸
05 How do I schedule a building inspection in unincorporated Billings County, ND? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Billings County Planning and Zoning Department before applying. Jaspector is not legal advice.