jaspector
§ NC Wake County
City building permits

Town of Cary

How to apply for a building permit in Town of Cary, North Carolina. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Inspections and Permits Department, Town of Cary

Street address
316 N. Academy Street, Cary, NC 27513
Coverage
Town of Cary handles permits and inspections in Cary jurisdiction and utility-served areas described in its fee and permit guides.
Online portal
Cary Online Permit Portal / Electronic Review Center
Cary Online Permit Portal / Electronic Review Center
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Cary

Required for new buildings, additions, alterations, accessory structures, and trade work regulated by the NC code and Cary permit rules.

Note: Cary's public permit pages indicate some home improvement projects require permits and others do not; confirm current exempt-work details with the specific project page before work starts. Typical NC exempt categories may include certain cosmetic interior finishes and ordinary repairs that do not affect structure or life safety systems.

Required documents
  • Application
  • Full plans drawn to scale
  • Site/civil information as applicable
  • Contractor information
  • Discipline-specific documents listed in Cary submittal guides
Building code
2018 NC State Building Code family with NC amendments; Cary's 2025 commercial guide expressly says plans are reviewed using the 2018 edition
Owner-builder
Owner applicants may apply where allowed, but trade and code compliance requirements still apply.
Contractor requirements
NC general contractor license generally required at $40,000 or more; licensed trade contractors required for electrical, plumbing, and mechanical work.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Review the applicable residential or commercial plan-submittal guide and fee estimation guide.
  2. 02
    Prepare complete plans and supporting forms for the project scope.
  3. 03
    Submit the permit package online through Cary's portal.
  4. 04
    Staff reviews for completeness and code compliance; incomplete plans may not be accepted.
  5. 05
    Pay permit and development fees when or before permit issuance.
  6. 06
    Receive permit issuance and schedule inspections.

Source: Inspections and Permits Department, Town of Cary ↗

§ 04

Fee schedule

Cary building permit fees

Fee type
Amount
01
Minimum permit fee
Residential new or relocated dwelling/addition $200 minimum; residential alteration $100 minimum; each residential trade permit $100 minimum; nonresidential new/addition $200 minimum; nonresidential trade permit $100 minimum
02
Plan check fee
Embedded in permit processing structure; not broken out as a separate universal percentage in the reviewed fee guide
03
Permit fee formula
Square-footage based for core building permits, plus utility/development/transportation fees where applicable
04
Reinspection fee
Verify current approved budget and inspections page for current ancillary fees

Building permit, development, and water/sewer related fees are collected when or before permit issuance

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Typical sequence: Foundation, slab/under-slab, rough framing and rough trades, insulation, finals, and closeout.

§ 06

Frequently asked

Common questions about Cary permits

01 Do I need a building permit in Cary, NC?
Required for new buildings, additions, alterations, accessory structures, and trade work regulated by the NC code and Cary permit rules.
02 How much does a building permit cost in Cary, NC?
Building permit fees in Cary, NC are set by the local building department and vary by project type and valuation. The minimum permit fee is Residential new or relocated dwelling/addition $200 minimum; residential alteration $100 minimum; each residential trade permit $100 minimum; nonresidential new/addition $200 minimum; nonresidential trade permit $100 minimum. Fees are calculated as: Square-footage based for core building permits, plus utility/development/transportation fees where applicable. Plan check fee: Embedded in permit processing structure; not broken out as a separate universal percentage in the reviewed fee guide.
03 How do I apply for a building permit in Cary, NC?
To apply for a building permit in Cary, NC, follow these steps: 1. Review the applicable residential or commercial plan-submittal guide and fee estimation guide. 2. Prepare complete plans and supporting forms for the project scope. 3. Submit the permit package online through Cary's portal. 4. Staff reviews for completeness and code compliance; incomplete plans may not be accepted. 5. Pay permit and development fees when or before permit issuance. 6. Receive permit issuance and schedule inspections.
04 How do I schedule a building inspection in Cary, NC?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Cary, NC via: Cary's permit system.
last verified April 2026 source Inspections and Permits Department, Town of Cary ↗ entry id permits/north-carolina/wake/cary

Educational reference. Permit rules and fees change — confirm current requirements directly with Inspections and Permits Department, Town of Cary before applying. Jaspector is not legal advice.