§ 01

Permit authority

Build High Point / Development Services Center

Street address
211 S. Hamilton Street, High Point, NC 27260
Coverage
City-issued permits for property inside High Point city limits, including the Guilford County portion of High Point. High Point operates its own permitting and inspection program separate from Guilford County.
Online portal
Build High Point Online Portal
Accela Citizen Access
§ 02

When a permit is required

Permit triggers and exempt work for High Point

Permits are required for new construction, additions, alterations, changes of occupancy, and other regulated development activity, with trade permits handled through the same system.

Note: No single High Point exempt-work page was clearly surfaced. Because High Point applies the NC State Building Code, verify any claimed permit exemption against NC statutory minor-repair exemptions and High Point staff guidance before proceeding without a permit.

Required documents
  • Application form
  • Plans
  • Contractor information
  • Supporting documents by record type
  • Zoning compliance materials where applicable
  • Professional licenses linked to user accounts
Building code
NC State Building Code as locally enforced by High Point; current statewide enforcement remains the 2018 code with amendments per NC OSFM context.
Permit validity
A simple current public expiration summary was not clearly surfaced in the High Point pages reviewed.
Owner-builder
Not clearly summarized on the public High Point pages reviewed; confirm directly with Build High Point for owner-contractor affidavit rules under NC law.
Contractor requirements
NC general contractor licensure rules apply for projects at or above state thresholds. Licensed trade contractors are required where state law requires.
§ 03

Application process

Typical processing: Five business days for revised zoning-compliance applications; same-business-day inspection scheduling through ACA if requested before 6:00 a.m. No single universal permit issuance timeline was posted for all building permits.

  1. 01
    Identify the correct record type or application path in Build High Point.
  2. 02
    Prepare the required application and supporting documents. High Point OTC residential permits use an over-the-counter application; larger or more complex projects may benefit from a pre-application conference.
  3. 03
    Submit online through Accela Citizen Access or at the Development Services Center.
  4. 04
    High Point routes the application for staff review and issues comments or conditions if revisions are needed.
  5. 05
    Pay all permit fees before issuance.
  6. 06
    Permit is issued through Build High Point, after which required inspections are scheduled through ACA or by phone or voicemail process.

Typical processing time: Five business days for revised zoning-compliance applications; same-business-day inspection scheduling through ACA if requested before 6:00 a.m. No single universal permit issuance timeline was posted for all building permits.

Source: Build High Point / Development Services Center ↗

§ 04

Fee schedule

High Point building permit fees

Fee type
Amount
01
Plan check fee
Included by record type where applicable; no single separate universal plan-check percentage was identified.
02
Permit fee formula
Mixed schedule. High Point uses flat fees, square-foot formulas, and record-specific fees depending on permit type.
03
Reinspection fee
After-hours inspections require a two-hour minimum fee. Other optional inspection charges and permit-related fees are in the development fee schedule.

High Point accepts cash, Discover, MasterCard, Visa, check, or money order in person, and cash, Discover, MasterCard, Visa, and e-check online through ACA.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Inspections may be requested through ACA until 6:00 a.m. for that business day.
Inspection hours
After-hours inspections are available for eligible commercial projects with a requested two-day notice.

Typical sequence: Required inspections are established at permit issuance and listed on the permit; trade and building inspections occur during construction, followed by final inspection and certificate issuance as applicable.

Source: Build High Point / Development Services Center ↗

§ 06

Frequently asked

Common questions about High Point permits

01 Do I need a building permit in High Point, NC?
Permits are required for new construction, additions, alterations, changes of occupancy, and other regulated development activity, with trade permits handled through the same system.
02 How much does a building permit cost in High Point, NC?
Building permit fees in High Point, NC are set by the local building department and vary by project type and valuation. Fees are calculated as: Mixed schedule. High Point uses flat fees, square-foot formulas, and record-specific fees depending on permit type.. Plan check fee: Included by record type where applicable; no single separate universal plan-check percentage was identified..
03 How do I apply for a building permit in High Point, NC?
To apply for a building permit in High Point, NC, follow these steps: 1. Identify the correct record type or application path in Build High Point. 2. Prepare the required application and supporting documents. High Point OTC residential permits use an over-the-counter application; larger or more complex projects may benefit from a pre-application conference. 3. Submit online through Accela Citizen Access or at the Development Services Center. 4. High Point routes the application for staff review and issues comments or conditions if revisions are needed. 5. Pay all permit fees before issuance. 6. Permit is issued through Build High Point, after which required inspections are scheduled through ACA or by phone or voicemail process.
04 How long does it take to get a building permit in High Point, NC?
Building permit processing times in High Point, NC typically run Five business days for revised zoning-compliance applications; same-business-day inspection scheduling through ACA if requested before 6:00 a.m. No single universal permit issuance timeline was posted for all building permits.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in High Point, NC?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in High Point, NC via: Accela Citizen Access, Voicemail scheduling. Inspections may be requested through ACA until 6:00 a.m. for that business day..
last verified April 2026 source Build High Point / Development Services Center ↗ entry id permits/north-carolina/guilford/high-point

Educational reference. Permit rules and fees change — confirm current requirements directly with Build High Point / Development Services Center before applying. Jaspector is not legal advice.