jaspector
§ NC Davie County
City building permits

Town of Bermuda Run

How to apply for a building permit in Town of Bermuda Run, North Carolina. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services

Street address
Town of Bermuda Run, 120 Kinderton Blvd, #100, Bermuda Run, NC 27006; Davie County Planning & Development Services, 298 E. Depot Street, Suite 100, Mocksville, NC 27028
Coverage
All applications for zoning permits must be submitted to the town zoning administrator. All applications for building permits must be submitted to Davie County.
Online portal
OpenGov Permitting & Licensing
OpenGov
§ 02

When a permit is required

Permit triggers and exempt work for Bermuda Run

Bermuda Run requires zoning permit submission through the town before county building permitting. Davie County then handles building permits, plan review, and inspections for new construction and renovations.

One-story detached accessory buildings used as tool or storage sheds, playhouses, or similar uses, if under 12 feet in any dimension and under 144 square feet, unless the roof extends closer than 5 feet to another structure
Nonstructural work costing $20,000 or less in a single-family residence, including replacement of windows, doors, exterior siding, pickets, railings, gutters, or porch flooring, if the work does not affect structural load-bearing elements, fire safety elements, plumbing, gas, or electrical systems
  • Exempt One-story detached accessory buildings used as tool or storage sheds, playhouses, or similar uses, if under 12 feet in any dimension and under 144 square feet, unless the roof extends closer than 5 feet to another structure
  • Exempt Nonstructural work costing $20,000 or less in a single-family residence, including replacement of windows, doors, exterior siding, pickets, railings, gutters, or porch flooring, if the work does not affect structural load-bearing elements, fire safety elements, plumbing, gas, or electrical systems

Note: Bermuda Run-specific exempt work categories were not clearly posted. County building permit exemptions follow North Carolina statute.

Required documents
  • For zoning permits: Owner and contractor identification, parcel and zoning information, proposed use, dimensions, impervious surface, utilities, and an attached site plan
  • For county permits: Complete Davie County application and plans package
Building code
2018 North Carolina Building Code and 2018 NC Existing Building Code
Permit validity
County building permit expiration is controlled by G.S. 160D-1111. Bermuda Run's public pages reviewed did not clearly post a zoning permit expiration rule.
Owner-builder
No Bermuda Run-specific owner-builder rule was clearly posted. Davie County provides an Owner Exemption Affidavit for county permits.
Contractor requirements
North Carolina statewide contractor licensing rules apply, including general contractor licensure at $40,000 and above and licensed electrical contractor requirements.

Source: Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services ↗

§ 03

Application process

Typical processing: Bermuda Run does not appear to publish a zoning review turnaround. County timing is about 10 business days residential and about 20 business days commercial after complete submission.

  1. 01
    Submit a zoning permit application to the Bermuda Run zoning administrator using the town's zoning permit application form.
  2. 02
    Provide owner, contractor, parcel, project, and site-plan information on the zoning permit form.
  3. 03
    After local zoning approval, submit the building permit application to Davie County Planning & Development Services.
  4. 04
    Create an OpenGov account, open a new permit record, and upload required county plans and documents.
  5. 05
    County review proceeds under Davie County's published permit timelines, then the county issues the permit and inspections are requested through the county process.

Typical processing time: Bermuda Run does not appear to publish a zoning review turnaround. County timing is about 10 business days residential and about 20 business days commercial after complete submission.

Source: Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Town zoning approval first, county building permit second, county inspections thereafter according to the building and trade scopes of work.

Source: Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services ↗

§ 05

Frequently asked

Common questions about Bermuda Run permits

01 Do I need a building permit in Bermuda Run, NC?
Bermuda Run requires zoning permit submission through the town before county building permitting. Davie County then handles building permits, plan review, and inspections for new construction and renovations.
02 How do I apply for a building permit in Bermuda Run, NC?
To apply for a building permit in Bermuda Run, NC, follow these steps: 1. Submit a zoning permit application to the Bermuda Run zoning administrator using the town's zoning permit application form. 2. Provide owner, contractor, parcel, project, and site-plan information on the zoning permit form. 3. After local zoning approval, submit the building permit application to Davie County Planning & Development Services. 4. Create an OpenGov account, open a new permit record, and upload required county plans and documents. 5. County review proceeds under Davie County's published permit timelines, then the county issues the permit and inspections are requested through the county process.
03 How long does it take to get a building permit in Bermuda Run, NC?
Building permit processing times in Bermuda Run, NC typically run Bermuda Run does not appear to publish a zoning review turnaround. County timing is about 10 business days residential and about 20 business days commercial after complete submission.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Bermuda Run, NC?
Not all construction work requires a permit in Bermuda Run, NC. The following work is generally exempt: One-story detached accessory buildings used as tool or storage sheds, playhouses, or similar uses, if under 12 feet in any dimension and under 144 square feet, unless the roof extends closer than 5 feet to another structure; Nonstructural work costing $20,000 or less in a single-family residence, including replacement of windows, doors, exterior siding, pickets, railings, gutters, or porch flooring, if the work does not affect structural load-bearing elements, fire safety elements, plumbing, gas, or electrical systems. Note: Bermuda Run-specific exempt work categories were not clearly posted. County building permit exemptions follow North Carolina statute. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Bermuda Run, NC?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bermuda Run, NC via: 336-998-0906, Davie County portal.
last verified April 2026 source Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services ↗ entry id permits/north-carolina/davie/bermuda-run

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Bermuda Run Planning and Zoning / Davie County Planning & Development Services before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Davie County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Davie County jurisdictions →