Permit authority

Town of Galway Building Department / Code Enforcement

Street address
5910 Sacandaga Road, Galway, NY 12074
Coverage
All properties within the Town of Galway.
Online portal
Code Enforcement
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Galway

Before undertaking construction or demolition covered by NYS or town codes, applicants must obtain a building permit.

Note: Contact Code Enforcement for exemption information.

Required documents
  • Completed permit application
  • Construction plans (11 by 17 paper plus digital copy)
  • Site plan
Building code
NYS Uniform Fire Prevention and Building Code
Permit validity
Contact department for validity period.
Owner-builder
Contact department for owner-builder requirements.
Contractor requirements
Contractors must comply with town requirements.
§ 03

Application process

Typical processing: At least two weeks in main season; longer if ZBA approval required.

  1. 01
    Contact Code Enforcement before undertaking construction.
  2. 02
    Permits can take at least two weeks in main construction season; longer if ZBA approval is required.
  3. 03
    Submit plans on 11 by 17 paper plus a digital copy (effective 2022).
  4. 04
    Obtain required inspections before moving to next phase.
  5. 05
    Certificate of occupancy issued after final inspection.

Typical processing time: At least two weeks in main season; longer if ZBA approval required.

Source: Town of Galway Building Department / Code Enforcement ↗

§ 04

Fee schedule

Galway building permit fees

Fee type
Amount
01
Minimum permit fee
$100 (accessory structures)
02
Permit fee formula
Accessory structures: $0.14 per square foot with $100 minimum

The town publishes permit forms and fee materials. Confirm current fees with Code Enforcement.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 518-882-6070 ext. 19 (phone)
Scheduling deadline
At least 24 hours' notice required
Inspection hours
Contact department for hours

Typical sequence: Required inspection sequence: Footings before concrete, foundation before backfill, septic before backfill, rough framing and systems before enclosure, and final inspection before certificate of occupancy.

§ 06

Frequently asked

Common questions about Galway permits

01 Do I need a building permit in Galway, NY?
Before undertaking construction or demolition covered by NYS or town codes, applicants must obtain a building permit.
02 How much does a building permit cost in Galway, NY?
Building permit fees in Galway, NY are set by the local building department and vary by project type and valuation. The minimum permit fee is $100 (accessory structures). Fees are calculated as: Accessory structures: $0.14 per square foot with $100 minimum.
03 How do I apply for a building permit in Galway, NY?
To apply for a building permit in Galway, NY, follow these steps: 1. Contact Code Enforcement before undertaking construction. 2. Permits can take at least two weeks in main construction season; longer if ZBA approval is required. 3. Submit plans on 11 by 17 paper plus a digital copy (effective 2022). 4. Obtain required inspections before moving to next phase. 5. Certificate of occupancy issued after final inspection.
04 How long does it take to get a building permit in Galway, NY?
Building permit processing times in Galway, NY typically run At least two weeks in main season; longer if ZBA approval required.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Galway, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Galway, NY via: 518-882-6070 ext. 19. At least 24 hours' notice required.
last verified April 2026 source Town of Galway Building Department / Code Enforcement ↗ entry id permits/new-york/saratoga/galway

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Galway Building Department / Code Enforcement before applying. Jaspector is not legal advice.