When a permit is required
Permit triggers and exempt work for Pendleton
Building permits are required for new construction, structural modifications, additions, patio covers, porches, decks, utility sheds, roofing, fireplaces, pools, fences, signs, and excavations other than for building construction.
Note: Starting work without a permit is a code violation that triggers a stop-work order and double fees. Confirm requirements before proceeding.
- Completed permit application (general or single-family dwelling)
- Survey or site plan
- Construction drawings
- Flood or wetland information where applicable
- Soil reports and drainage information for single-family dwellings
- Building code
- NYS Uniform Fire Prevention and Building Code
- Permit validity
- Determined by Building Department
- Owner-builder
- Owner-builders should contact the Building Department for specific requirements.
- Contractor requirements
- Contractors should carry appropriate licenses and insurance.
Application process
Typical processing: Varies by project type; typically 1-4 weeks
- 01 Obtain the appropriate permit application form from the Town website or Building Department.
- 02 Prepare required supporting documents including survey, site plan, construction drawings, flood/wetland information, soil reports, and drainage information as applicable.
- 03 Submit completed application and documents to the Building Department.
- 04 Pay applicable permit fees.
- 05 A violation and stop-work order will be issued if work begins without a permit.
Typical processing time: Varies by project type; typically 1-4 weeks
Source: Building Department ↗
Fee schedule
Pendleton building permit fees
Contact the Building Department for current fee schedules.
Required inspections
Scheduling and sequence
- 716-625-8833 ext. 115 and 114 (phone)
- Building Department, 6570 Campbell Blvd (in-person)
- Scheduling deadline
- Consult with Building Department
- Inspection hours
- Typically Monday-Friday, 8:30 AM to 5:00 PM
- Time windows
- Varies by inspection type
Typical sequence: Inspections include foundation, framing, electrical, plumbing, and final occupancy inspections.
Varies by Building Department discretion
Source: Building Department ↗
Frequently asked
Common questions about Pendleton permits
01 Do I need a building permit in Pendleton, NY? ▸
02 How much does a building permit cost in Pendleton, NY? ▸
03 How do I apply for a building permit in Pendleton, NY? ▸
04 How long does it take to get a building permit in Pendleton, NY? ▸
05 How do I schedule a building inspection in Pendleton, NY? ▸