On this page 6
When a permit is required
Permit triggers and exempt work for St. Armand
A building permit is required before commencing construction, improvement, removal, or demolition of buildings or structures, and before installing heating equipment, except for listed exemptions.
- Exempt Certain necessary repairs and agricultural buildings
- Exempt Noncommercial storage facilities under 140 square feet
- Exempt Certain replacement work
- Exempt Other exemptions per instruction form
Note: Exempt from building permit does not mean exempt from zoning and floodplain requirements. Applicants in floodplain areas must obtain separate floodplain permit. Confirm edge cases with the Code Officer before proceeding.
- Completed building permit application
- Site plan or property sketch
- Construction plans or project description
- Proof of ownership or authorization
- Building code
- 2020 New York State Uniform Fire Prevention and Building Code and Energy Code
- Permit validity
- Typically 6-12 months from issuance; check with town for specific validity period.
- Owner-builder
- Owner-builders may be permitted; contact the Code Officer for requirements.
- Contractor requirements
- Contractors should hold appropriate licensing; verify with town.
Source: Town Code Enforcement Officer ↗
Application process
Typical processing: Typically 1-3 weeks for standard applications.
- 01 Download and complete the Building Permit and Information form from the Forms and Information page.
- 02 Gather required documentation including site plan, construction plans, workers' compensation info or exemption, and proof of ownership.
- 03 Submit application to the Code Enforcement Officer, Robert W. Hammond, at 1702 NYS Route 3, Bloomingdale.
- 04 Code Officer reviews application and informs applicant of the applicable permit fee.
- 05 Pay permit fees as invoiced.
- 06 Obtain permit issuance before commencing work.
- 07 Schedule required inspections with the Code Officer.
Typical processing time: Typically 1-3 weeks for standard applications.
Source: Town Code Enforcement Officer ↗
Fee schedule
St. Armand building permit fees
Contact Code Officer for payment methods and options.
Required inspections
Scheduling and sequence
- 518-891-3189 or 518-524-4158 (cell) (phone)
- rhammondceostarmand@yahoo.com (email)
- Scheduling deadline
- Contact Code Officer for scheduling; typically 24-72 hours advance notice.
- Inspection hours
- Contact town for office hours
- Time windows
- Contact town for available inspection windows
Typical sequence: Standard New York building inspection sequence applies.
Contact Code Officer to inquire about remote inspection availability.
Frequently asked
Common questions about St. Armand permits
01 Do I need a building permit in St. Armand, NY? ▸
02 How much does a building permit cost in St. Armand, NY? ▸
03 How do I apply for a building permit in St. Armand, NY? ▸
04 How long does it take to get a building permit in St. Armand, NY? ▸
05 What work is exempt from building permits in St. Armand, NY? ▸
06 How do I schedule a building inspection in St. Armand, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town Code Enforcement Officer before applying. Jaspector is not legal advice.