jaspector
City building permits

Village of McGraw

How to apply for a building permit in Village of McGraw, New York. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of McGraw Code Enforcement

Street address
24 Cemetery Street, McGraw, NY 13101
Coverage
Applies within Village of McGraw limits.
Online portal
Village of McGraw Forms and Permits
GovWell portal
§ 02

When a permit is required

Permit triggers and exempt work for McGraw

Building permits are required for construction, alterations, demolitions, and other regulated work under the New York State Uniform Fire Prevention and Building Code and village code.

Minor repairs and maintenance
Certain structures under specified size thresholds
  • Exempt Minor repairs and maintenance
  • Exempt Certain structures under specified size thresholds

Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm with village code enforcement before proceeding.

Required documents
  • Completed building permit application
  • Site plan or project description
  • Construction plans (as required by village)
  • Code and zoning compliance documentation
  • Fee payment
Building code
New York State Uniform Fire Prevention and Building Code and State Energy Conservation Construction Code
Permit validity
Per village regulations; applicants should confirm with code enforcement.
Owner-builder
Owner-builders may undertake work on their own property subject to village requirements.
Contractor requirements
Contractors must comply with New York State licensing requirements and village requirements.

Source: Village of McGraw Code Enforcement ↗

§ 03

Application process

Typical processing: 2-4 weeks after submission and fee payment.

  1. 01
    Confirm the property is within Village of McGraw limits.
  2. 02
    Start from the village Forms page or GovWell permit link.
  3. 03
    Contact village code enforcement if the online portal does not clearly match the project type.
  4. 04
    Submit required forms and supporting materials through the village's published process.
  5. 05
    Obtain permit approval before beginning permit-required work.
  6. 06
    Coordinate inspections with village code enforcement.

Typical processing time: 2-4 weeks after submission and fee payment.

Source: Village of McGraw Code Enforcement ↗

§ 04

Fee schedule

McGraw building permit fees

Fee type
Amount
01
Minimum permit fee
Varies; contact village code enforcement
02
Permit fee formula
Varies by project type

Contact village code enforcement for fee details and payment methods.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Village clerk at mcgrawclerk@verizon.net (email)
Scheduling deadline
Contact village office for scheduling details.
Inspection hours
Business hours; contact for specific times
Time windows
Varies; contact code enforcement

Typical sequence: Follows New York State code inspection sequence.

Contact village code enforcement for current inspection practices.

Source: Village of McGraw Code Enforcement ↗

§ 06

Frequently asked

Common questions about McGraw permits

01 Do I need a building permit in McGraw, NY?
Building permits are required for construction, alterations, demolitions, and other regulated work under the New York State Uniform Fire Prevention and Building Code and village code.
02 How much does a building permit cost in McGraw, NY?
Building permit fees in McGraw, NY are set by the local building department and vary by project type and valuation. The minimum permit fee is Varies; contact village code enforcement. Fees are calculated as: Varies by project type.
03 How do I apply for a building permit in McGraw, NY?
To apply for a building permit in McGraw, NY, follow these steps: 1. Confirm the property is within Village of McGraw limits. 2. Start from the village Forms page or GovWell permit link. 3. Contact village code enforcement if the online portal does not clearly match the project type. 4. Submit required forms and supporting materials through the village's published process. 5. Obtain permit approval before beginning permit-required work. 6. Coordinate inspections with village code enforcement.
04 How long does it take to get a building permit in McGraw, NY?
Building permit processing times in McGraw, NY typically run 2-4 weeks after submission and fee payment.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in McGraw, NY?
Not all construction work requires a permit in McGraw, NY. The following work is generally exempt: Minor repairs and maintenance; Certain structures under specified size thresholds. Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm with village code enforcement before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in McGraw, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in McGraw, NY via: Village clerk at mcgrawclerk@verizon.net. Contact village office for scheduling details..
last verified April 2026 source Village of McGraw Code Enforcement ↗ entry id permits/new-york/cortland/village-mcgraw

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of McGraw Code Enforcement before applying. Jaspector is not legal advice.