How to apply for a building permit in Town of AuSable, New York. Permit authority, application steps, fees, and inspection requirements.

Avg processing
1-3 weeks typical
Min. permit fee
Contact Code Enforcement
Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of AuSable Code Enforcement / Building Department

Street address
111 AuSable Street, Keeseville, NY 12944
Coverage
All properties within the Town of AuSable outside village limits.
Online portal
Code Enforcement Department
In-person and Phone Submissions
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for AuSable

Building permits are required for construction of dwellings, garages, additions, decks, porches, pools, sheds, and similar work.

Minor repairs and maintenance
Some small accessory structures (verify with Code Enforcement)
  • Exempt Minor repairs and maintenance
  • Exempt Some small accessory structures (verify with Code Enforcement)

Note: Contact Code Enforcement to verify which work requires a permit; exemptions depend on type and scope of work.

Required documents
  • Completed permit application
  • Plot plan
  • Construction plans
  • APA review approval (if applicable)
  • Clinton County Health Department approval (if applicable)
Building code
New York State Uniform Fire Prevention and Building Code
Permit validity
Typically 1 year from issuance
Owner-builder
Owner-builders may perform work on their own properties subject to permit and inspection requirements.
Contractor requirements
Contractors must comply with New York State requirements.

Source: Town of AuSable Code Enforcement / Building Department ↗

§ 03

Application process

Typical processing: 1-3 weeks typical

  1. 01
    Contact Code Enforcement Official Trent Gravelle to discuss your project.
  2. 02
    Obtain the all-in-one permit packet from the town.
  3. 03
    Complete the permit application with required supporting documents.
  4. 04
    Prepare plot plan and construction plans as required.
  5. 05
    Submit application to Code Enforcement with all required approvals (APA review, health department, etc.).
  6. 06
    Pay applicable permit fees.
  7. 07
    Schedule inspections as work progresses (by appointment only).
  8. 08
    Obtain certificate of occupancy upon completion.

Typical processing time: 1-3 weeks typical

Source: Town of AuSable Code Enforcement / Building Department ↗

§ 04

Fee schedule

Effective Current

Fee type
Amount
01
Minimum permit fee
Contact Code Enforcement
02
Plan check fee
Included in permit fee
03
Permit fee formula
See fee schedule document
04
Trade permit fee
Varies by trade
05
Reinspection fee
Additional inspection fees may apply
06
Penalty (no permit)
Building without permit subject to penalties

Payment at Code Enforcement Office

Fees change periodically. Confirm at the official fee schedule ↗ (effective Current) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Call Code Enforcement at 518-975-6202 (phone)
  • Visit office at 111 AuSable Street, Keeseville (in-person)
Scheduling deadline
By appointment only; schedule in advance
Inspection hours
Business hours; confirm with office
Time windows
Scheduled appointment basis

Typical sequence: Inspections required at various stages; contact Code Enforcement for details.

Contact Code Enforcement for virtual inspection availability.

Source: Town of AuSable Code Enforcement / Building Department ↗

§ 06

Frequently asked

Common questions about AuSable permits

01 Do I need a building permit in AuSable, NY?
Building permits are required for construction of dwellings, garages, additions, decks, porches, pools, sheds, and similar work.
02 How much does a building permit cost in AuSable, NY?
Building permit fees in AuSable, NY are set by the local building department and vary by project type and valuation. The minimum permit fee is Contact Code Enforcement. Fees are calculated as: See fee schedule document. Plan check fee: Included in permit fee.
03 How do I apply for a building permit in AuSable, NY?
To apply for a building permit in AuSable, NY, follow these steps: 1. Contact Code Enforcement Official Trent Gravelle to discuss your project. 2. Obtain the all-in-one permit packet from the town. 3. Complete the permit application with required supporting documents. 4. Prepare plot plan and construction plans as required. 5. Submit application to Code Enforcement with all required approvals (APA review, health department, etc.). 6. Pay applicable permit fees. 7. Schedule inspections as work progresses (by appointment only). 8. Obtain certificate of occupancy upon completion.
04 How long does it take to get a building permit in AuSable, NY?
Building permit processing times in AuSable, NY typically run 1-3 weeks typical. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in AuSable, NY?
Not all construction work requires a permit in AuSable, NY. The following work is generally exempt: Minor repairs and maintenance; Some small accessory structures (verify with Code Enforcement). Note: Contact Code Enforcement to verify which work requires a permit; exemptions depend on type and scope of work. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in AuSable, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in AuSable, NY via: Call Code Enforcement at 518-975-6202, Visit office at 111 AuSable Street, Keeseville. By appointment only; schedule in advance.
last verified April 2026 source Town of AuSable Code Enforcement / Building Department ↗ entry id permits/new-york/clinton/ausable

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of AuSable Code Enforcement / Building Department before applying. Jaspector is not legal advice.