When a permit is required
Permit triggers and exempt work for Fair Haven
A building permit is required for any work that must conform to the Uniform Code and/or Energy Code.
Note: Consult the Code Enforcement Officer for exempt work determinations.
- Permit application
- Plans and specifications
- Supporting materials as required
- Building code
- NYS Uniform Fire Prevention and Building Code
Application process
Typical processing: Typically 2-4 weeks from submission.
- 01 Contact the Village of Fair Haven at 315-947-5112 or visit the village office.
- 02 Obtain the building permit application and fee schedule.
- 03 Complete the permit application with required documents and plans.
- 04 Submit to the village office and pay the applicable fee.
- 05 Follow the inspection process and obtain certificate of occupancy before occupying the building.
- 06 For properties in a flood hazard area, flood-hazard certification may be required before certificate issuance.
Typical processing time: Typically 2-4 weeks from submission.
Fee schedule
Effective October 27, 2017
Permit renewals are 50% of the original fee.
Fees change periodically. Confirm at the official fee schedule ↗ (effective October 27, 2017) before budgeting.
Required inspections
Scheduling and sequence
- 315-947-5112 (phone)
Frequently asked
Common questions about Fair Haven permits
01 Do I need a building permit in Fair Haven, NY? ▸
02 How much does a building permit cost in Fair Haven, NY? ▸
03 How do I apply for a building permit in Fair Haven, NY? ▸
04 How long does it take to get a building permit in Fair Haven, NY? ▸
05 How do I schedule a building inspection in Fair Haven, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Fair Haven Code Enforcement before applying. Jaspector is not legal advice.