§ 01

Permit authority

Building Department

Street address
2524 US Rte 9W, Ravena, NY 12143
Coverage
All properties within the Town of Coeymans.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Coeymans

A building permit is required for work that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, removal, relocation, demolition, and installation of a solid-fuel appliance, chimney, or flue.

Note: Required inspections depend on project type; approved plans must be maintained on site. Contact the Building Department for details.

Required documents
  • Completed and signed application
  • Owner signatures
  • Two plan sets (when required)
  • Insurance or CE-200 materials
  • Survey/plot plan showing setbacks
  • Deed copy (may be required)
Building code
New York State Uniform Fire Prevention and Building Code and Energy Code
Permit validity
Varies by permit type; contact the department for details.
Owner-builder
Contact the Building Department for owner-builder requirements.
Contractor requirements
Contractors must maintain required insurance coverage.
§ 03

Application process

Typical processing: Varies by project complexity; contact the Building Department for specific timelines.

  1. 01
    Obtain the completed and signed building permit application from the Building Department.
  2. 02
    Provide owner signatures, two plan sets when required, insurance or CE-200 materials, and survey/plot plan showing setbacks.
  3. 03
    Deed copy may be required.
  4. 04
    Submit the complete application to the Building Department.
  5. 05
    Pay the permit fee.
  6. 06
    Wait for approval and permit issuance before starting work.
  7. 07
    Do not occupy or use the new or renovated structure until a final certificate of occupancy or certificate of compliance has been issued.

Typical processing time: Varies by project complexity; contact the Building Department for specific timelines.

Source: Building Department ↗

§ 04

Fee schedule

Coeymans building permit fees

Fee type
Amount
01
Minimum permit fee
$25
02
Permit fee formula
One- and two-family homes including accessory structures constructed contemporaneously: $200 for first 1,500 sq ft, plus $100 for each additional 1,000 sq ft or fraction. Pools and hot tubs: $50. Above-ground pool with deck: $100. Sheds under 500 sq ft: $25.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 518-756-2850 (phone)
Inspection hours
Monday to Friday, 8:00 a.m. to 4:30 p.m.

Typical sequence: Required inspections depend on project type; contact the Building Department for sequencing details.

§ 06

Frequently asked

Common questions about Coeymans permits

01 Do I need a building permit in Coeymans, NY?
A building permit is required for work that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, removal, relocation, demolition, and installation of a solid-fuel appliance, chimney, or flue.
02 How much does a building permit cost in Coeymans, NY?
Building permit fees in Coeymans, NY are set by the local building department and vary by project type and valuation. The minimum permit fee is $25. Fees are calculated as: One- and two-family homes including accessory structures constructed contemporaneously: $200 for first 1,500 sq ft, plus $100 for each additional 1,000 sq ft or fraction. Pools and hot tubs: $50. Above-ground pool with deck: $100. Sheds under 500 sq ft: $25..
03 How do I apply for a building permit in Coeymans, NY?
To apply for a building permit in Coeymans, NY, follow these steps: 1. Obtain the completed and signed building permit application from the Building Department. 2. Provide owner signatures, two plan sets when required, insurance or CE-200 materials, and survey/plot plan showing setbacks. 3. Deed copy may be required. 4. Submit the complete application to the Building Department. 5. Pay the permit fee. 6. Wait for approval and permit issuance before starting work. 7. Do not occupy or use the new or renovated structure until a final certificate of occupancy or certificate of compliance has been issued.
04 How long does it take to get a building permit in Coeymans, NY?
Building permit processing times in Coeymans, NY typically run Varies by project complexity; contact the Building Department for specific timelines.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Coeymans, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Coeymans, NY via: 518-756-2850.