City Building Permits
Lovington, NM - 2026 Building Permit Guide
How to apply for a building permit in Lovington, New Mexico. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Covers all construction within Lovington city limits. Lovington is the Lea County seat. Department assists with both local and state CID required permitting.
- Department
- Planning and Zoning Department
- Address
- 214 South Love Street, Lovington, NM 88260
- Phone
- (575) 396-9301
- cball@lovington.org
Online Permit Portal
Platform: Paper-based (no dedicated online permit portal) • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Contact Planning and Zoning at (575) 396-9301 or cball@lovington.org to confirm zoning compliance and permit requirements.
- Obtain and complete the applicable application (state CID Multi-Purpose State Building Application or city application as directed).
- Gather required documents: site plan, construction drawings, warranty deed or proof of ownership, contractor license information.
- Submit completed application package to City Hall, 214 South Love Street, during office hours.
- City conducts plan review for compliance with local zoning, floodplain, and state codes.
- If state CID permit is required (typical for construction work), city forwards to or assists applicant with CID submission.
- Pay applicable permit fees.
- Obtain permit and schedule inspections with the department.
- Receive final approval/Certificate of Occupancy upon completion of required inspections.
Typical processing time: Contact department for estimate
Source: Planning and Zoning Department
General Requirements
New construction, additions, alterations, demolitions, and all trade work (electrical, plumbing, mechanical) within city limits.
Required Documents
- Completed application
- Site plan with property lines and proposed structure dimensions
- Construction drawings
- Proof of ownership
- Contractor license numbers
- Permit validity
- Per state 14.5.2 NMAC: expires if work not commenced within 180 days of issuance or suspended more than 180 days.
- Building code
- State of New Mexico construction codes as adopted through NM RLD/CID. Includes 2021 NM Residential and Commercial Building Codes, 2020 NEC, UPC, UMC.
- Owner-builder
- State homeowner permit (14.5.2.18 NMAC) applies. Owner must be primary occupant, must complete major portion of work, may subcontract to licensed trades. One homeowner permit per 12-month period. Electrical requires competency exam. HVAC/gas work excluded.
- Contractor requirements
- NM CID license required for all contractors. State trades licensing required for electrical, plumbing, and mechanical.
Fees
- Plan check fee
- State baseline: 20% of building permit fee.
- Permit fee formula
- Fees based on type of construction, square footage, type of materials, and construction costs. State CID baseline: $3.00 per $1,000 up to $15,000 valuation; $1.00 per $1,000 over $15,000.
- Payment note
- Municipal online payments portal available at https://lovingtonnm.municipalonlinepayments.com/lovingtonnm
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- One-story detached accessory structures 120 sq ft or less with no utilities
- Retaining walls not exceeding 4 feet in height
- Water tanks supported directly on grade, capacity 5,000 gallons or less
- Sidewalks and driveways not more than 30 inches above adjacent grade
- Finishing work (painting, papering, tiling, carpeting, cabinets, counter tops)
- Prefabricated swimming pools under 24 inches deep and 5,000 gallons or less
- Swings and playground equipment accessory to dwellings
- Window awnings with limited projection
- Partitions under 5 feet 9 inches in height
Important: Contact the Planning and Zoning Department to confirm project-specific exemptions within city limits.
Inspections
How to Schedule
- (575) 396-9301 (phone)
- Inspection hours
- Monday through Thursday 7:30 AM to 5:00 PM; Friday 8:00 AM to 12:00 PM
Typical inspection sequence: Standard NM sequence: foundation, rough framing/trade rough-in, insulation, final. Department provides inspection list at permit issuance.
Additional Resources
- Building code: State of New Mexico construction codes as adopted through NM RLD/CID. Includes 2021 NM Residential and Commercial Building Codes, 2020 NEC, UPC, UMC.
- Verify contractor license: NM RLD Contractor License Lookup
- Zoning information: View zoning info
- City of Lovington Main Site
- NM CID Forms
- License lookup guide: New Mexico Contractor License Requirements
- Contract template: New Mexico Homeowner-Contractor Agreement
- New Mexico hub: New Mexico Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Planning and Zoning Department before applying.
Frequently Asked Questions
Lovington Building Permit FAQ
- Do I need a building permit in Lovington, NM?
- New construction, additions, alterations, demolitions, and all trade work (electrical, plumbing, mechanical) within city limits.
- How much does a building permit cost in Lovington, NM?
- Fees are calculated as: Fees based on type of construction, square footage, type of materials, and construction costs. State CID baseline: $3.00 per $1,000 up to $15,000 valuation; $1.00 per $1,000 over $15,000.. Plan check fee: State baseline: 20% of building permit fee..
- How do I apply for a building permit in Lovington, NM?
- 1. Contact Planning and Zoning at (575) 396-9301 or cball@lovington.org to confirm zoning compliance and permit requirements. 2. Obtain and complete the applicable application (state CID Multi-Purpose State Building Application or city application as directed). 3. Gather required documents: site plan, construction drawings, warranty deed or proof of ownership, contractor license information. 4. Submit completed application package to City Hall, 214 South Love Street, during office hours. 5. City conducts plan review for compliance with local zoning, floodplain, and state codes. 6. If state CID permit is required (typical for construction work), city forwards to or assists applicant with CID submission. 7. Pay applicable permit fees. 8. Obtain permit and schedule inspections with the department. 9. Receive final approval/Certificate of Occupancy upon completion of required inspections.
- How long does it take to get a building permit in Lovington, NM?
- Typical processing time is Contact department for estimate.
- What work is exempt from building permits in Lovington, NM?
- The following work is generally exempt: One-story detached accessory structures 120 sq ft or less with no utilities; Retaining walls not exceeding 4 feet in height; Water tanks supported directly on grade, capacity 5,000 gallons or less; Sidewalks and driveways not more than 30 inches above adjacent grade; Finishing work (painting, papering, tiling, carpeting, cabinets, counter tops); Prefabricated swimming pools under 24 inches deep and 5,000 gallons or less; Swings and playground equipment accessory to dwellings; Window awnings with limited projection; Partitions under 5 feet 9 inches in height. Note: Contact the Planning and Zoning Department to confirm project-specific exemptions within city limits.
- How do I schedule a building inspection in Lovington, NM?
- Inspections can be scheduled via: (575) 396-9301.
Need help with your project?
Navigating permits in Lovington can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Lea County
View all Lea County jurisdictions →