Town of Nottingham, NH - 2026 Building Permit Guide
How to apply for a building permit in Town of Nottingham, New Hampshire. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Town of Nottingham issues building permits within town limits.
- Department
- Building/Code/Health Inspector
- Address
- 139 Stage Road / P.O. Box 114, Nottingham, NH 03290
- Phone
- (603) 679-9597
Online Permit Portal
Platform: Town website; downloadable forms • Account required: No • Submission: In-person only
Application Process
Typical processing time: 24-48 hours for complete applications; 30-day maximum
Source: Building/Code/Health Inspector
General Requirements
All new construction including porches, swimming pools (above and
Required Documents
- Construction plans to scale
- site plan with setbacks from property lines
- Building code
- NH State Building Code (RSA 155-A)
- Owner-builder
- Not specified publicly
- Contractor requirements
- State-licensed trades required; inspections required for
Fees
- Minimum permit fee
- No charge for sheds under 145 sq ft
- Plan check fee
- Not specified separately
- Permit fee formula
- Not specified publicly; see fee schedule on department page
- Payment note
- All fees must be paid before permit review begins
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Sheds under 145 square feet (permit required but no fee charged)
Inspections
How to Schedule
- Town website; downloadable forms (online)
Typical inspection sequence: Contact department; required inspections list available at
Additional Resources
- Building code: NH State Building Code (RSA 155-A)
- Verify contractor license: CSLB License Lookup
- Zoning information: View zoning info
- License lookup guide: New Hampshire Contractor License Requirements
- Contract template: New Hampshire Homeowner-Contractor Agreement
- New Hampshire hub: New Hampshire Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building/Code/Health Inspector before applying.
Frequently Asked Questions
Town of Nottingham Building Permit FAQ
- Do I need a building permit in Town of Nottingham, NH?
- All new construction including porches, swimming pools (above and
- How much does a building permit cost in Town of Nottingham, NH?
- The minimum permit fee is No charge for sheds under 145 sq ft. Fees are calculated as: Not specified publicly; see fee schedule on department page. Plan check fee: Not specified separately.
- How long does it take to get a building permit in Town of Nottingham, NH?
- Typical processing time is 24-48 hours for complete applications; 30-day maximum.
- What work is exempt from building permits in Town of Nottingham, NH?
- The following work is generally exempt: Sheds under 145 square feet (permit required but no fee charged).
- How do I schedule a building inspection in Town of Nottingham, NH?
- Inspections can be scheduled via: Town website; downloadable forms.
Need help with your project?
Navigating permits in Town of Nottingham can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector works