How to apply for a building permit in City of Fallon, Nevada. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

City of Fallon Building Department (Community Development)

Street address
55 W. Williams Avenue, Fallon, NV 89406
Coverage
All properties within the incorporated city limits of Fallon, Nevada. Properties outside city limits require Churchill County permits.
Online portal
City of Fallon Business Licenses and Building Permits
PDF Forms (In-Person Submission)
§ 02

When a permit is required

Permit triggers and exempt work for Fallon

A building permit is required for new construction, additions, and alterations to residential and commercial buildings; accessory structures and garages 120 sq ft or larger; covered porches with solid roofs; roof repairs or replacements; new or repaired residential septic systems; and pre-fabricated sheds, carports, or cargo containers. The City uses the International Building Code (IBC). Concrete patios, driveways, and wood decks at grade are exempt; elevated decks or patios 30+ inches above ground require permits.

Note: Contact the City of Fallon Building Department at (775) 423-5107 for a complete list of work exempt from permit requirements. Generally, exempt work may include minor repairs and maintenance, but specific exemptions should be confirmed with the Building Department. Even if exempt from building permit requirements, zoning regulations, business license requirements, and other codes may still apply.

Required documents
  • Completed City of Fallon Building Permit Application
  • Two (2) sets of plans including one (1) wet-stamped set
  • Minimum plan size: 11" x 17"
  • Maximum plan size: 24" x 36"
  • Only complete applications accepted
  • Site plans showing property boundaries and structure location
Building code
As of December 2025, City of Fallon adopted the 2024 editions of the following codes (via Ordinance 788/Bill 807): 2024 International Building Code (IBC) with Appendices C, E, H, and I; 2024 International Residential Code (IRC) with Appendices AB, BF, CA, CB, CD, and CE; 2024 International Existing Building Code (IEBC) with Appendices A and B; 2024 International Fuel Gas Code (IFGC) with Appendices A, B, and C; 2024 International Mechanical Code (IMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 Uniform Plumbing Code (UPC) with Appendices A, B, and D; 2024 Uniform Mechanical Code (UMC) with Appendices A, B, and C; 2024 International Energy Conservation Code (IECC); 2023 National Electrical Code (NEC); 2024 Northern Nevada Amendments (NNA) published February 20, 2025. Notable amendments: IBC Section 113 deleted entirely; IBC Section 312.1 deleted "more than 7 feet (2134 mm) in height"; IBC Section 1612.3 inserted "Churchill County and Incorporated Areas" and "April 5, 2021" (flood date reference); IRC Section R112 deleted entirely; IEBC Section 112 deleted entirely; IFGC Section 112 deleted entirely; IMC Sections 112 and 113 deleted entirely; ISPSC Section 112 deleted entirely; IECC Section 109 deleted entirely; IBC Table 1608.2.1 Ground Snow Loads modified for City of Fallon.
Permit validity
Contact City Building Department for current permit validity periods.
Owner-builder
Homeowners may act as owner-builders for their own primary residence under Nevada NRS 624.031. Must complete Owner-Builder Affidavit of Exemption. Cannot sell or lease within 1 year of completion. Must directly supervise all work. All subcontractors must be NSCB-licensed. Must comply with all employer tax and insurance requirements.
Contractor requirements
All contractors must be licensed by the Nevada State Contractors Board (NSCB). NSCB Website: https://www.nvcontractorsboard.com/. Northern Nevada: (775) 688-1141. Southern Nevada: (702) 486-1100. Unlicensed contracting is a criminal offense in Nevada.

Source: City of Fallon Building Department (Community Development) ↗

§ 03

Application process

Typical processing: Contact City Building Department at (775) 423-5107 for current processing times.

  1. 01
    Download permit application forms from the City website at https://www.fallonnevada.gov/business/business-licenses-building-permits/
  2. 02
    Complete all required fields on the building permit application form.
  3. 03
    Prepare and compile required plan sets.
  4. 04
    Bring completed application and plans in person to the City Building Department at 55 W. Williams Avenue, Fallon, NV 89406.
  5. 05
    City staff will review application and plans for code compliance.
  6. 06
    Pay required permit fees (contact office for fee schedule at (775) 423-5107).
  7. 07
    Receive permit upon approval and payment.
  8. 08
    Call (775) 423-5107 to schedule required inspections.

Typical processing time: Contact City Building Department at (775) 423-5107 for current processing times.

Source: City of Fallon Building Department (Community Development) ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (775) 423-5107 (phone)
Scheduling deadline
Contact department for required advance notice

Typical sequence: Standard sequence typically includes: Foundation inspection; Framing/rough-in inspection; Insulation inspection (if required); Final inspection. Contact City Building Department for specific inspection requirements for your project.

Source: City of Fallon Building Department (Community Development) ↗

§ 05

Frequently asked

Common questions about Fallon permits

01 Do I need a building permit in Fallon, NV?
A building permit is required for new construction, additions, and alterations to residential and commercial buildings; accessory structures and garages 120 sq ft or larger; covered porches with solid roofs; roof repairs or replacements; new or repaired residential septic systems; and pre-fabricated sheds, carports, or cargo containers. The City uses the International Building Code (IBC). Concrete patios, driveways, and wood decks at grade are exempt; elevated decks or patios 30+ inches above ground require permits.
02 How do I apply for a building permit in Fallon, NV?
To apply for a building permit in Fallon, NV, follow these steps: 1. Download permit application forms from the City website at https://www.fallonnevada.gov/business/business-licenses-building-permits/ 2. Complete all required fields on the building permit application form. 3. Prepare and compile required plan sets. 4. Bring completed application and plans in person to the City Building Department at 55 W. Williams Avenue, Fallon, NV 89406. 5. City staff will review application and plans for code compliance. 6. Pay required permit fees (contact office for fee schedule at (775) 423-5107). 7. Receive permit upon approval and payment. 8. Call (775) 423-5107 to schedule required inspections.
03 How long does it take to get a building permit in Fallon, NV?
Building permit processing times in Fallon, NV typically run Contact City Building Department at (775) 423-5107 for current processing times.. Timelines can vary based on project complexity and current department workload.
04 How do I schedule a building inspection in Fallon, NV?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Fallon, NV via: (775) 423-5107. Contact department for required advance notice.
last verified April 2026 source City of Fallon Building Department (Community Development) ↗ entry id permits/nevada/churchill/fallon

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Fallon Building Department (Community Development) before applying. Jaspector is not legal advice.