When a permit is required
Permit triggers and exempt work for Bloomington
A building permit is required for: new single-family and two-family dwellings; new commercial buildings, including agricultural buildings used commercially; detached structures such as decks; and detached accessory buildings. Contact the Village Office to confirm the full trigger list and any size thresholds that apply.
Note: Contact the Village of Bloomington at (308) 775-2185 to confirm whether your project requires a permit before proceeding.
- Completed building permit application
- Property address or legal description
- Owner details
- Contractor details
- Estimated project cost
- Building code
- Bloomington enforces its building permit program through contracted inspection services with General Engineering Company. Projects must comply with village ordinances and applicable Nebraska state building code standards (2018 IBC/IRC).
- Contractor requirements
- Contractors and subcontractors with Nebraska employees must register annually with the Nebraska Department of Labor (NDOL) — registration is distinct from a state general contractor license, which does not exist in Nebraska. Cost: $25/year; workers' compensation certificate required. Website: https://dol.nebraska.gov/conreg
Application process
Typical processing: Contact the Village Office for current timelines.
- 01 Download the building permit application from https://villageofbloomington.com/building-permits or obtain a paper copy from the Village Office.
- 02 Complete the application with required information: project description, property address/legal description, owner and contractor details, and estimated project cost.
- 03 Submit the completed application form along with the designated fee to Josh Copsey, the Village Building Inspector, or through the Village Office at (308) 775-2185.
- 04 Inspection services are provided by General Engineering Company under contract with the village.
- 05 Obtain Nebraska State Electrical Division (NSED) electrical permit for any electrical work.
- 06 For commercial or public-assembly projects, submit plans to the Nebraska State Fire Marshal (NSFM) for fire/life safety plan review.
- 07 If construction disturbs one or more acres, obtain an NDEE Construction Stormwater General Permit (Notice of Intent) before breaking ground.
Typical processing time: Contact the Village Office for current timelines.
Required inspections
Scheduling and sequence
- (308) 775-2185 (phone)
Typical sequence: Inspection services are provided by General Engineering Company under contract with the village.
Frequently asked
Common questions about Bloomington permits
01 Do I need a building permit in Bloomington, NE? ▸
02 How do I apply for a building permit in Bloomington, NE? ▸
03 How long does it take to get a building permit in Bloomington, NE? ▸
04 How do I schedule a building inspection in Bloomington, NE? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Bloomington — Village Office before applying. Jaspector is not legal advice.