On this page 6
When a permit is required
Permit triggers and exempt work for Chadron
Building permits are required for: all new residential or commercial construction; additions and structural alterations; accessory buildings of 120 square feet or more of floor area; enclosing a porch, patio covers, carports; garages; fences (all types require a fence permit); decks 30 inches or more above the ground or any deck with a roof; repair work involving structural members or changing/enlarging openings; sign permits and right-of-way permits (sidewalks, driveways, plantings).
- Exempt Cosmetic work (siding, roofing, painting)
- Exempt One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses where the floor area does not exceed 120 square feet
Note: Exempt from building permit does not mean exempt from zoning requirements. Even permit-exempt structures must comply with zoning setback and use regulations. Confirm edge cases with the Building and Zoning Department before proceeding.
- Completed building permit application
- Site plan showing property boundaries and proposed structure placement
- Setback information from property lines and roads
- Construction drawings as applicable for the project type
- Building code
- Chadron has adopted building and zoning codes. The specific edition of IBC/IRC adopted should be confirmed with the Building and Zoning Department. At minimum, the Nebraska statewide energy code (2018 IECC / ASHRAE 90.1-2016, Climate Zone 5B) applies.
- Permit validity
- Contact the Building and Zoning Department to confirm permit expiration periods and validity rules for issued permits.
- Owner-builder
- Owner-builders may obtain permits for their own projects; contact the department for any specific requirements or affidavit needs.
- Contractor requirements
- Plumbers and electricians performing work in Chadron must be licensed and pay an annual $35 occupation tax to the city, in addition to state licensing (NSEB electrical or state plumbing license). All contractors must register with the Nebraska Department of Labor if earning $2,000 or more annually from construction work ($25 annual fee; workers' compensation insurance required).
Application process
Typical processing: Not publicly specified. Routine residential permits in Chadron are typically processed within a few business days to two weeks. Contact the department for current turnaround times.
- 01 Contact the Chadron Building and Zoning Department at (308) 432-0505 to confirm whether a permit is required for your project and obtain current application materials.
- 02 Download or obtain permit application forms from the Building and Zoning Documents page on the city website or in person at City Hall, 234 Main Street.
- 03 Prepare required documents: completed permit application form, site plan showing property boundaries and proposed structure placement with setbacks, and construction drawings as applicable for the project type.
- 04 Submit the completed application and documents in person at City Hall, 234 Main Street.
- 05 Pay applicable permit fees at time of submission. Note: all Building Services permit fees are double if work is started without a permit.
- 06 Await plan review and permit issuance; the building official reviews the application for compliance with the zoning ordinance and adopted building codes.
- 07 Post the permit card at the job site before commencing work.
- 08 Contact the Building and Zoning Department to schedule required inspections at appropriate stages of construction.
- 09 Obtain final inspection sign-off upon project completion and confirm whether a Certificate of Occupancy is issued for your project type.
Typical processing time: Not publicly specified. Routine residential permits in Chadron are typically processed within a few business days to two weeks. Contact the department for current turnaround times.
Fee schedule
Effective Fiscal Year 2024-2025 (adopted September 3, 2024)
Fees change periodically. Confirm at the official fee schedule ↗ (effective Fiscal Year 2024-2025 (adopted September 3, 2024)) before budgeting.
Required inspections
Scheduling and sequence
- Building and Zoning Department (308) 432-0505 (phone)
- City Hall, 234 Main Street (in-person)
- Scheduling deadline
- Contact the Building and Zoning Department to schedule inspections at appropriate stages of construction.
- Inspection hours
- Monday-Friday, 8:00 AM to 5:00 PM
- Time windows
- Contact the department for available inspection scheduling windows.
Typical sequence: Typical sequence for residential new construction: footing/foundation inspection; framing/rough-in; insulation/energy code inspection; final inspection. Confirm required inspection points with the department when permit is issued.
Frequently asked
Common questions about Chadron permits
01 Do I need a building permit in Chadron, NE? ▸
02 How do I apply for a building permit in Chadron, NE? ▸
03 How long does it take to get a building permit in Chadron, NE? ▸
04 What work is exempt from building permits in Chadron, NE? ▸
05 How do I schedule a building inspection in Chadron, NE? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Chadron Building and Zoning Department before applying. Jaspector is not legal advice.