When a permit is required
Permit triggers and exempt work for Cass County
New residential and commercial construction; additions and alterations; accessory structures (garages, pole barns, sheds, decks); demolitions; any development in a FEMA-designated floodplain (floodplain development permit required even if no building permit is otherwise needed).
Note: Specific exemptions should be confirmed with the Cass County Zoning Department at (402) 296-9359. Agricultural buildings may be exempt from certain requirements under Nebraska Revised Statute 23-114; confirm this with the zoning office if applicable.
- Completed building permit application
- Site plan showing lot dimensions, setbacks from all property lines, and location of all proposed structures
- Construction plans (floor plans, elevations, foundation plan)
- Plot plan or survey
- Contractor registration documentation
- Floodplain development permit materials if in FEMA Special Flood Hazard Area
- Building code
- 2012 International Building Code (IBC); 2012 International Residential Code (IRC); 2012 International Plumbing Code (IPC); 2012 International Mechanical Code (IMC); 2012 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2023 National Electrical Code (NEC/NFPA 70 — administered by the Nebraska State Electrical Division, not the county)
- Permit validity
- Standard Nebraska practice is 180 days from issuance to commence work. Confirm with the zoning office.
- Owner-builder
- Owner-builder rules are not separately published. Contact the zoning office at (402) 296-9359.
- Contractor requirements
- Cass County requires contractor registration as a condition of pulling permits. All contractors in Nebraska must also register with the Nebraska Department of Labor (annual $25 fee; registration at dol.nebraska.gov/conreg). Nebraska does not issue a statewide general contractor license.
Application process
Typical processing: Not published on county website. Contact (402) 296-9359 for current average review times.
- 01 Verify the property is in unincorporated Cass County (not within a city or village corporate limit). Contact the zoning office at (402) 296-9359 or check the county GIS if uncertain about jurisdiction.
- 02 Determine which permits are needed: building permit, floodplain development permit (if in FEMA Special Flood Hazard Area), county road access permit (if new driveway onto a county road), and/or septic permit (if new or modified on-site wastewater system — apply separately to the County Health Department).
- 03 Download the appropriate application packet from https://www.casscountyne.gov/county-zoning or obtain forms in person at the zoning office.
- 04 For new residential construction, use the New Residential Building Packet, which consolidates required forms and checklists.
- 05 Contractors must register with the county before pulling permits; complete and submit the Contractor Registration Application if not already registered.
- 06 Prepare required documents including completed permit application, site plan, construction plans, and contractor registration documentation.
- 07 Submit completed application, required documents, and applicable fee to the Cass County Zoning Department at 13860 12th St., Plattsmouth, NE 68048-1964 (in person or by mail).
- 08 Staff reviews the application. Processing times are not published; contact the office for current turnaround estimates.
- 09 Once approved, permit is issued. Post the permit on the job site and retain a copy throughout construction.
- 10 Schedule required inspections at each construction milestone by calling the zoning office at (402) 296-9359.
- 11 For floodplain projects: Obtain two Elevation Certificates (one pre-construction, one post-completion) completed by a licensed surveyor.
- 12 Request final inspection upon completion of work. Certificate of Occupancy issued after satisfactory final inspection.
Typical processing time: Not published on county website. Contact (402) 296-9359 for current average review times.
Required inspections
Scheduling and sequence
- (402) 296-9359 (phone)
- Scheduling deadline
- Minimum 24-hour notice required for inspection requests.
- Inspection hours
- Monday–Friday, 8:00 AM–12:00 PM and 1:00 PM–4:30 PM (excluding holidays)
Typical sequence: Typical sequence for residential construction: foundation/footing inspection (before pouring concrete); framing inspection (after framing complete, before insulation or sheathing covers framing); rough-in inspections for plumbing and mechanical (before walls are closed); insulation inspection (where required by IECC); final building inspection (all work complete, ready for occupancy).
Frequently asked
Common questions about unincorporated Cass County permits
01 Do I need a building permit in unincorporated Cass County, NE? ▸
02 How do I apply for a building permit in unincorporated Cass County, NE? ▸
03 How long does it take to get a building permit in unincorporated Cass County, NE? ▸
04 How do I schedule a building inspection in unincorporated Cass County, NE? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Cass County Planning and Zoning Department before applying. Jaspector is not legal advice.