When a permit is required
Permit triggers and exempt work for Butte-Silver Bow
New constructionExpansion or structural modification of existing structuresSubstantial electrical or plumbing workMoving a structureChanging the use of a structureDemolition
- Exempt One-story detached accessory structures used as tool sheds, playhouses and similar uses
- Exempt Fences not over 7 feet high
- Exempt Retaining walls not over 4 feet in height measured from bottom of footing to top of wall (unless supporting a surcharge or impounding Class I, II, or IIIA liquids)
- Exempt Ordinary repairs to structures
- Exempt Replacement of lamps or connection of approved portable electrical equipment to approved permanently installed receptacles
- Exempt Temporary testing systems for testing or servicing electrical equipment
- Exempt Portable heating appliances, ventilation equipment, and cooling units with replacement of minor parts that don't alter approval or create unsafe conditions
Note: Exemption from permit requirements does not grant authorization to perform work in violation of code or other laws/ordinances.
- Building Permit Application form
- Site Plan with location of all buildings, dimensions from other buildings/lot lines, height of new construction
- Contractor information (must have current edition of International Building Code on-site per BSMB 15.040.090)
- Documents specified in applicable checklists
- Building code
- 2021 International Building Code
- Contractor requirements
- Must have current edition of International Building Code on-site per BSMB 15.040.090
Source: Building & Code Enforcement ↗
Application process
Typical processing: Approximately 3 weeks for initial plan review
- 01 Complete Building Permit Application (available online or at courthouse)
- 02 Prepare Site Plan showing location of all buildings on site, dimensions from other buildings/lot lines, and height of new construction
- 03 Compile all required documents (no partial packages accepted)
- 04 Submit via GovWell online portal or in-person at courthouse
- 05 Building & Code Enforcement reviews and approves plans
- 06 Permit is issued upon approval
- 07 Applicant schedules required inspections
- 08 Upon final inspection approval, permit is closed
Typical processing time: Approximately 3 weeks for initial plan review
Source: Building & Code Enforcement ↗
Fee schedule
Butte-Silver Bow building permit fees
Contact Building & Code Enforcement office or check Butte-Silver Bow Municipal Code Title 15 for current fees
Required inspections
Scheduling and sequence
- Contact Building & Code Enforcement in advance (phone)
- Scheduling deadline
- One business day in advance
- Inspection hours
- Typical business hours
- Time windows
- Typical business hours (specific times available from department)
Typical sequence: Standard building inspection sequence follows International Building Code (framing, electrical, plumbing, mechanical, final)
Source: Building & Code Enforcement ↗
Frequently asked
Common questions about Butte-Silver Bow permits
01 Do I need a building permit in Butte-Silver Bow, MT? ▸
02 How much does a building permit cost in Butte-Silver Bow, MT? ▸
03 How do I apply for a building permit in Butte-Silver Bow, MT? ▸
04 How long does it take to get a building permit in Butte-Silver Bow, MT? ▸
05 What work is exempt from building permits in Butte-Silver Bow, MT? ▸
06 How do I schedule a building inspection in Butte-Silver Bow, MT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building & Code Enforcement before applying. Jaspector is not legal advice.