jaspector
City building permits

Florissant

How to apply for a building permit in Florissant, Missouri. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Florissant Public Works, Building Division

Street address
Florissant City Hall, 955 St. Francois, Florissant, MO 63031
Coverage
Florissant runs its own building, zoning, permit, occupancy, plan review, and inspection program inside city limits
Online portal
https://my.florissantmo.com
Florissant online permitting portal
§ 02

When a permit is required

Permit triggers and exempt work for Florissant

The Building Division says it issues construction permits and occupancy permits and performs related plan review and inspections for residential and commercial projects. Public guides identify quick-issue permits and plan-review-required permits

Thin public citywide exemption summary located during this research; Florissant instead posts quick-issue permit examples and plan-review-required examples. Confirm before starting work
  • Exempt Thin public citywide exemption summary located during this research; Florissant instead posts quick-issue permit examples and plan-review-required examples. Confirm before starting work
Required documents
  • When a permit is required: The Building Division says it issues construction permits and occupancy permits and performs related plan review and inspections for residential and commercial projects. Public guides identify quick-issue permits and plan-review-required permits
  • Required documents: Application, plans, zoning authorization where applicable, and supporting construction information
  • Permit validity/expiration: Occupancy inspection materials indicate some inspections are time-limited; verify permit expiration per permit type
  • Owner-builder rules if available: Not clearly summarized in one public landing page
  • Contractor license requirements: Verify contractor requirements with Public Works before filing; city materials reference contractor prequalification and permit-specific requirements
  • Building code adopted: City public materials reference 2021 International Residential Code and city modifications; confirm the full current adopted code set directly with Florissant
Building code
City public materials reference 2021 International Residential Code and city modifications; confirm the full current adopted code set directly with Florissant
Permit validity
Occupancy inspection materials indicate some inspections are time-limited; verify permit expiration per permit type
Owner-builder
Not clearly summarized in one public landing page
Contractor requirements
Verify contractor requirements with Public Works before filing; city materials reference contractor prequalification and permit-specific requirements
§ 03

Application process

Typical processing: Not stated as a single posted SLA; review time depends on permit type and whether plan review is required

  1. 01
    Pull the correct application from the Public Works permit applications page or the online portal
  2. 02
    Submit plans and permit materials through the portal, by email to publicworks@florissantmo.com, or directly with Public Works
  3. 03
    Pay applicable fees; Florissant materials state the city can accept credit and debit cards over the phone and checks by mail
  4. 04
    Receive permit approval, complete inspections, and obtain occupancy approval where applicable

Typical processing time: Not stated as a single posted SLA; review time depends on permit type and whether plan review is required

Source: City of Florissant Public Works, Building Division ↗

§ 04

Fee schedule

Florissant building permit fees

Fee type
Amount
01
Minimum permit fee
Construction permit pricing starts at $95 on the public works fee list; a $10 application fee is included where noted
02
Plan check fee
Included in permit pricing structure where plan review is required; see fee list
03
Permit fee formula
Quick-issue permits use posted flat charges; plan-review permits use a fee scale starting at $95
04
Reinspection fee
Additional or extra inspection $50; stop work order $50; permit extensions or amendments $40

Applications may be emailed; card payments can be taken over the phone and checks may be mailed to City Hall

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Through Florissant Public Works / Building Division ()
Inspection hours
Monday-Friday, 8:00 a.m. to 5:00 p.m

Typical sequence: Plan review, permit issuance, trade and building inspections, then occupancy inspection where applicable

§ 06

Frequently asked

Common questions about Florissant permits

01 Do I need a building permit in Florissant, MO?
The Building Division says it issues construction permits and occupancy permits and performs related plan review and inspections for residential and commercial projects. Public guides identify quick-issue permits and plan-review-required permits
02 How much does a building permit cost in Florissant, MO?
Building permit fees in Florissant, MO are set by the local building department and vary by project type and valuation. The minimum permit fee is Construction permit pricing starts at $95 on the public works fee list; a $10 application fee is included where noted. Fees are calculated as: Quick-issue permits use posted flat charges; plan-review permits use a fee scale starting at $95. Plan check fee: Included in permit pricing structure where plan review is required; see fee list.
03 How do I apply for a building permit in Florissant, MO?
To apply for a building permit in Florissant, MO, follow these steps: 1. Pull the correct application from the Public Works permit applications page or the online portal 2. Submit plans and permit materials through the portal, by email to publicworks@florissantmo.com, or directly with Public Works 3. Pay applicable fees; Florissant materials state the city can accept credit and debit cards over the phone and checks by mail 4. Receive permit approval, complete inspections, and obtain occupancy approval where applicable
04 How long does it take to get a building permit in Florissant, MO?
Building permit processing times in Florissant, MO typically run Not stated as a single posted SLA; review time depends on permit type and whether plan review is required. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Florissant, MO?
Not all construction work requires a permit in Florissant, MO. The following work is generally exempt: Thin public citywide exemption summary located during this research; Florissant instead posts quick-issue permit examples and plan-review-required examples. Confirm before starting work. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Florissant, MO?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Florissant, MO via: Through Florissant Public Works / Building Division.
last verified April 2026 source City of Florissant Public Works, Building Division ↗ entry id permits/missouri/st-louis-city/florissant

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Florissant Public Works, Building Division before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in St. Louis City.

Same county, different permit office. Click for that jurisdiction's full guide.

All St. Louis City jurisdictions →