On this page 6
When a permit is required
Permit triggers and exempt work for Jefferson County
County FAQ states permits are required for many building, structural, trade, and safety-related projects in unincorporated Jefferson County.
- Exempt Decks not exceeding 200 square feet, not over 30 inches above grade, not attached to a dwelling, and not serving the required exit door
- Exempt Fences not over 8 feet high
- Exempt Gas or electric hot water heater replacement
- Exempt One-story detached accessory structures not over 200 square feet
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Exempt Prefabricated swimming pools less than 24 inches deep
- Exempt Retaining walls not over 6 feet high unless supporting a surcharge
- Exempt Sidewalks and driveways not more than 30 inches above adjacent grade and not over a basement or story below
- Exempt Swings and playground equipment accessory to a one- or two-family dwelling
- Exempt Certain tanks, awnings, minor repairs, and emergency repairs filed the next business day where applicable
- Permit-specific plans
- Proof of ownership for Planning filings
- Site plan and checklist materials where zoning, CUP, variance, deviation, or plat review applies
- Building code
- Jefferson County Building Code fee ordinance and county code provisions; county FAQ exemption language tracks IRC-style thresholds. Planning and floodplain controls also apply where relevant.
- Contractor requirements
- County permit page separately lists contractor licenses.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the parcel is in unincorporated Jefferson County and identify whether Code Enforcement, Planning, Highway/Stormwater, floodplain, or sewage review applies.
- 02 For zoning and land-use filings, use the Citizen Portal and schedule any required pre-application conference with Planning at 636-797-5580.
- 03 Submit permit and plan materials to the applicable county division, including any deed or proof-of-ownership and checklist items required by Planning.
- 04 Pay plan review and permit fees under the county fee ordinance.
- 05 Receive permit approval before work starts and coordinate inspections as work progresses.
Fee schedule
Jefferson County building permit fees
Plan review and submittal fees are paid upon application and deducted from total fee.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Code Enforcement Division (in-person)
Typical sequence: Permit issuance, trade or structural inspections during work, then final approval; actual sequence varies by project and whether zoning, floodplain, sewage, or stormwater review applies.
Frequently asked
Common questions about unincorporated Jefferson County permits
01 Do I need a building permit in unincorporated Jefferson County, MO? ▸
02 How much does a building permit cost in unincorporated Jefferson County, MO? ▸
03 How do I apply for a building permit in unincorporated Jefferson County, MO? ▸
04 What work is exempt from building permits in unincorporated Jefferson County, MO? ▸
05 How do I schedule a building inspection in unincorporated Jefferson County, MO? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Jefferson County Code Enforcement Division before applying. Jaspector is not legal advice.