jaspector
§ MO Bates County
City building permits

Butler, Missouri

How to apply for a building permit in Butler, Missouri, Missouri. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Butler Building Inspections & Codes (per the city’s Building Inspections & Codes department listing).citeturn4search3turn6search0

Street address
22 W Ohio Street, Butler, MO 64730 (with P.O. Box 420 for mail).citeturn5view0
Coverage
Butler’s Building Inspections & Codes division handles construction, property maintenance, and permit compliance inside city limits.citeturn4search3
§ 02

When a permit is required

Permit triggers and exempt work for Butler, Missouri

Butler’s site reiterates that all new construction, additions, roofing, fences, and interior/exterior work affecting structural members or life safety require permits.citeturn5view0

No exempt-work list is posted; contact the inspection office before starting work you believe might be exempt.citeturn5view0
  • Exempt No exempt-work list is posted; contact the inspection office before starting work you believe might be exempt.citeturn5view0
Required documents
  • When a permit is required: Butler’s site reiterates that all new construction, additions, roofing, fences, and interior/exterior work affecting structural members or life safety require permits.citeturn5view0
  • Required documents: The city expects submitted plans to show zoning setbacks, structural detail, and utility connections (per the Building Inspection Process link).citeturn5view0
  • Permit validity/expiration: Not listed; ask the Clerk’s office for renewal/expiration rules.citeturn5view0
  • Owner-builder rules if available: No specific owner-builder policy is posted; verify with the inspection office.citeturn5view0
  • Contractor license requirements: The municipal code requires licensed contractors for certain trades—call the inspector to confirm licensing expectations.citeturn6search0
  • Building code adopted: Butler adopted the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Property Maintenance, Existing Building, Electrical, and Fire Codes.citeturn5view0
Building code
Butler adopted the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Property Maintenance, Existing Building, Electrical, and Fire Codes.citeturn5view0
Permit validity
Not listed; ask the Clerk’s office for renewal/expiration rules.citeturn5view0
Owner-builder
No specific owner-builder policy is posted; verify with the inspection office.citeturn5view0
Contractor requirements
The municipal code requires licensed contractors for certain trades—call the inspector to confirm licensing expectations.citeturn6search0
§ 03

Application process

Typical processing: Not posted online; consult the inspection office for current review timelines.citeturn4search0

  1. 01
    Download the relevant permit form (building, fence, pool, driveway, etc.) from the city’s building permits page and complete applicant/project details.citeturn4search0
  2. 02
    Submit the form, plans, and any supporting documents plus payment to City Hall for processing.citeturn5view0
  3. 03
    Staff review and inspections occur through the Building Inspections & Codes office; sign-offs are required before occupancy.citeturn5view0

Typical processing time: Not posted online; consult the inspection office for current review timelines.citeturn4search0

Source: City of Butler Building Inspections & Codes (per the city’s Building Inspections & Codes department listing).citeturn4search3turn6search0 ↗

§ 04

Fee schedule

Butler, Missouri building permit fees

Fee type
Amount
01
Minimum permit fee
A roof replacement permit is noted to cost $35, and other fees are managed per the published schedule.citeturn5view0
02
Plan check fee
Not broken out publicly; request details via the building division phone.citeturn5view0
03
Permit fee formula
Fees are based on the schedule linked from the building permits page; specific per-project formulas are not posted online.citeturn5view0
04
Reinspection fee
Not published; coordinate with the inspector’s office.citeturn6search0

Payment is due after review/approval; check with City Hall for accepted payment types.citeturn5view0

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Call 660-679-6323 to schedule inspections and get guidance.citeturn6search0 ()
Inspection hours
Not posted; confirm available times when you call.citeturn6search0

Typical sequence: Not posted; the Building Inspection Process outline notes that multiple inspections (rough plumbing, electrical, final) are part of the flow.citeturn5view0

§ 06

Frequently asked

Common questions about Butler, Missouri permits

01 Do I need a building permit in Butler, Missouri, MO? ▸
Butler’s site reiterates that all new construction, additions, roofing, fences, and interior/exterior work affecting structural members or life safety require permits.citeturn5view0
02 How much does a building permit cost in Butler, Missouri, MO? ▸
Building permit fees in Butler, Missouri, MO are set by the local building department and vary by project type and valuation. The minimum permit fee is A roof replacement permit is noted to cost $35, and other fees are managed per the published schedule.citeturn5view0. Fees are calculated as: Fees are based on the schedule linked from the building permits page; specific per-project formulas are not posted online.citeturn5view0. Plan check fee: Not broken out publicly; request details via the building division phone.citeturn5view0.
03 How do I apply for a building permit in Butler, Missouri, MO? ▸
To apply for a building permit in Butler, Missouri, MO, follow these steps: 1. Download the relevant permit form (building, fence, pool, driveway, etc.) from the city’s building permits page and complete applicant/project details.citeturn4search0 2. Submit the form, plans, and any supporting documents plus payment to City Hall for processing.citeturn5view0 3. Staff review and inspections occur through the Building Inspections & Codes office; sign-offs are required before occupancy.citeturn5view0
04 How long does it take to get a building permit in Butler, Missouri, MO? ▸
Building permit processing times in Butler, Missouri, MO typically run Not posted online; consult the inspection office for current review timelines.citeturn4search0. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Butler, Missouri, MO? ▸
Not all construction work requires a permit in Butler, Missouri, MO. The following work is generally exempt: No exempt-work list is posted; contact the inspection office before starting work you believe might be exempt.citeturn5view0. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Butler, Missouri, MO? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Butler, Missouri, MO via: Call 660-679-6323 to schedule inspections and get guidance.citeturn6search0.

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Butler Building Inspections & Codes (per the city’s Building Inspections & Codes department listing).citeturn4search3turn6search0 before applying. Jaspector is not legal advice.