§ MO Barry County
City building permits

Arrow Point (village)

How to apply for a building permit in Arrow Point (village), Missouri. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not published
Last verified
April 2026
On this page 6
§ 01

Permit authority

Arrow Point Village Board/Barry County Planning (no dedicated village permit website was found)

Street address
700 Main Street, Cassville, MO 65625 (Barry County Courthouse)
Coverage
Arrow Point is an incorporated village inside Barry County; building permits are best coordinated through Barry County Planning given the limited municipal web presence
§ 02

When a permit is required

Permit triggers and exempt work for Arrow Point (village)

Refer to Barry County’s fee schedule for the list of zoning/soil erosion permit triggers that apply throughout the county, including Arrow Point

No exempt list is published for Arrow Point; inquiries go through the county office
  • Exempt No exempt list is published for Arrow Point; inquiries go through the county office
Required documents
  • When a permit is required: Refer to Barry County’s fee schedule for the list of zoning/soil erosion permit triggers that apply throughout the county, including Arrow Point
  • Required documents: County fee schedule cites the need for site plans, setback data, and owner/contractor information
  • Permit validity/expiration: 12 months for soil erosion/zoning and six months for land division documents (per county fee schedule)
  • Owner-builder rules if available: Not publicly posted
  • Contractor license requirements: Not publicly posted
  • Building code adopted: Not publicly posted on the village website; consult county planners
Building code
Not publicly posted on the village website; consult county planners
Permit validity
12 months for soil erosion/zoning and six months for land division documents (per county fee schedule)
Owner-builder
Not publicly posted
Contractor requirements
Not publicly posted
§ 03

Application process

Typical processing: Not published

  1. 01
    Contact Barry County Planning (per the county website) to request a permit application for Arrow Point
  2. 02
    Provide the required site plan, valuation, and documentation as outlined in the county fee schedule
  3. 03
    Follow the county review and inspection process; ensure you understand the 12-month permit validity noted in the fee schedule

Typical processing time: Not published

§ 04

Fee schedule

Arrow Point (village) building permit fees

Fee type
Amount
01
Minimum permit fee
$25 for zoning items, $50 for other construction per county schedule
02
Plan check fee
Included in the printed fee schedule amounts
03
Permit fee formula
Valuation-based rates (e.g., $100 up to 10 acres, plus per-acre increments) are listed for each project type
04
Reinspection fee
After-the-fact fee $250; other penalty structures per county policy

Pay the Planning Office at the courthouse

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Arranged through Barry County Planning once the permit is issued ()
Inspection hours
Not published

Typical sequence: The county’s soil erosion fee table enumerates inspection figures (up to 10 per project type)

§ 06

Frequently asked

Common questions about Arrow Point (village) permits

01 Do I need a building permit in Arrow Point (village), MO?
Refer to Barry County’s fee schedule for the list of zoning/soil erosion permit triggers that apply throughout the county, including Arrow Point
02 How much does a building permit cost in Arrow Point (village), MO?
Building permit fees in Arrow Point (village), MO are set by the local building department and vary by project type and valuation. The minimum permit fee is $25 for zoning items, $50 for other construction per county schedule. Fees are calculated as: Valuation-based rates (e.g., $100 up to 10 acres, plus per-acre increments) are listed for each project type. Plan check fee: Included in the printed fee schedule amounts.
03 How do I apply for a building permit in Arrow Point (village), MO?
To apply for a building permit in Arrow Point (village), MO, follow these steps: 1. Contact Barry County Planning (per the county website) to request a permit application for Arrow Point 2. Provide the required site plan, valuation, and documentation as outlined in the county fee schedule 3. Follow the county review and inspection process; ensure you understand the 12-month permit validity noted in the fee schedule
04 How long does it take to get a building permit in Arrow Point (village), MO?
Building permit processing times in Arrow Point (village), MO typically run Not published. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Arrow Point (village), MO?
Not all construction work requires a permit in Arrow Point (village), MO. The following work is generally exempt: No exempt list is published for Arrow Point; inquiries go through the county office. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Arrow Point (village), MO?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Arrow Point (village), MO via: Arranged through Barry County Planning once the permit is issued.
last verified April 2026 entry id permits/missouri/barry/arrow-point

Educational reference. Permit rules and fees change — confirm current requirements directly with Arrow Point Village Board/Barry County Planning (no dedicated village permit website was found) before applying. Jaspector is not legal advice.