On this page 5
When a permit is required
Permit triggers and exempt work for Mathiston
New building construction within town limits, structural additions or alterations to existing buildings, electrical/plumbing/HVAC and mechanical system installations, roofing with structural component, demolition.
- Exempt Cosmetic interior work (painting, flooring, cabinet replacement)
- Exempt Minor repairs not affecting structural elements or systems
Note: Confirm exemptions with Town Hall before proceeding.
- Site plan showing lot, setbacks, and existing/proposed structures
- Construction drawings (stamped if required by project type or value)
- Contractor license verification for MSBOC-threshold projects
- Septic permit receipt (if applicable)
- Building code
- The specific building code edition adopted by Mathiston is not publicly documented online. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm the current adopted code and any local amendments.
- Permit validity
- Contact Town Hall for permit validity periods.
- Contractor requirements
- Contractors must hold a valid Mississippi State Board of Contractors (MSBOC) license for projects meeting specified value thresholds.
Application process
Typical processing: Varies by project complexity; contact Town Hall for estimate.
- 01 Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm permit requirements and applicable zoning for your property.
- 02 Confirm whether the property is in Webster County or Choctaw County portion of Mathiston.
- 03 Submit building permit application via online portal (ms.accessgov.com/mathiston/Forms/Page/mathiston/building-permit/), in person at 41 Mathis Drive, or by mail at P.O. Box 178, Mathiston, MS 39752.
- 04 Prepare required supporting documentation: site plan showing lot, setbacks, and existing/proposed structures, construction drawings (stamped if required by project type or value), contractor license verification for MSBOC-threshold projects, septic permit receipt if applicable.
- 05 Pay applicable fees at time of submission or upon approval.
- 06 Receive permit and post on construction site.
- 07 Schedule and complete required inspections.
- 08 Obtain final approval upon satisfactory final inspection.
Typical processing time: Varies by project complexity; contact Town Hall for estimate.
Source: Town of Mathiston — Town Hall ↗
Required inspections
Scheduling and sequence
- (662) 263-4898 (phone)
- townofmathiston@maxxsouth.net (email)
Typical sequence: Standard inspection phases: Foundation/Footing Inspection (before concrete pour), Framing/Rough-in Inspection (structural framing and MEP rough-in visible), Final Inspection (all work complete, systems operational). Given Mathiston's small size, inspection services may be provided by a contracted inspector. Confirm upon application.
Frequently asked
Common questions about Mathiston permits
01 Do I need a building permit in Mathiston, MS? ▸
02 How do I apply for a building permit in Mathiston, MS? ▸
03 How long does it take to get a building permit in Mathiston, MS? ▸
04 What work is exempt from building permits in Mathiston, MS? ▸
05 How do I schedule a building inspection in Mathiston, MS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Mathiston — Town Hall before applying. Jaspector is not legal advice.