jaspector
City building permits

Town of Mathiston

How to apply for a building permit in Town of Mathiston, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Mathiston — Town Hall

Street address
41 Mathis Drive, Mathiston, MS 39752
Coverage
Incorporated limits of the Town of Mathiston in Webster County. Mathiston straddles the border between Webster and Choctaw Counties; confirm which county's jurisdiction applies to your specific parcel before applying. Building permits within Mathiston's town limits are issued by Town Hall, not by Webster County or Choctaw County.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Mathiston

New building construction within town limits, structural additions or alterations to existing buildings, electrical/plumbing/HVAC and mechanical system installations, roofing with structural component, demolition.

Cosmetic interior work (painting, flooring, cabinet replacement)
Minor repairs not affecting structural elements or systems
  • Exempt Cosmetic interior work (painting, flooring, cabinet replacement)
  • Exempt Minor repairs not affecting structural elements or systems

Note: Confirm exemptions with Town Hall before proceeding.

Required documents
  • Site plan showing lot, setbacks, and existing/proposed structures
  • Construction drawings (stamped if required by project type or value)
  • Contractor license verification for MSBOC-threshold projects
  • Septic permit receipt (if applicable)
Building code
The specific building code edition adopted by Mathiston is not publicly documented online. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm the current adopted code and any local amendments.
Permit validity
Contact Town Hall for permit validity periods.
Contractor requirements
Contractors must hold a valid Mississippi State Board of Contractors (MSBOC) license for projects meeting specified value thresholds.
§ 03

Application process

Typical processing: Varies by project complexity; contact Town Hall for estimate.

  1. 01
    Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm permit requirements and applicable zoning for your property.
  2. 02
    Confirm whether the property is in Webster County or Choctaw County portion of Mathiston.
  3. 03
    Submit building permit application via online portal (ms.accessgov.com/mathiston/Forms/Page/mathiston/building-permit/), in person at 41 Mathis Drive, or by mail at P.O. Box 178, Mathiston, MS 39752.
  4. 04
    Prepare required supporting documentation: site plan showing lot, setbacks, and existing/proposed structures, construction drawings (stamped if required by project type or value), contractor license verification for MSBOC-threshold projects, septic permit receipt if applicable.
  5. 05
    Pay applicable fees at time of submission or upon approval.
  6. 06
    Receive permit and post on construction site.
  7. 07
    Schedule and complete required inspections.
  8. 08
    Obtain final approval upon satisfactory final inspection.

Typical processing time: Varies by project complexity; contact Town Hall for estimate.

Source: Town of Mathiston — Town Hall ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (662) 263-4898 (phone)
  • townofmathiston@maxxsouth.net (email)

Typical sequence: Standard inspection phases: Foundation/Footing Inspection (before concrete pour), Framing/Rough-in Inspection (structural framing and MEP rough-in visible), Final Inspection (all work complete, systems operational). Given Mathiston's small size, inspection services may be provided by a contracted inspector. Confirm upon application.

§ 05

Frequently asked

Common questions about Mathiston permits

01 Do I need a building permit in Mathiston, MS?
New building construction within town limits, structural additions or alterations to existing buildings, electrical/plumbing/HVAC and mechanical system installations, roofing with structural component, demolition.
02 How do I apply for a building permit in Mathiston, MS?
To apply for a building permit in Mathiston, MS, follow these steps: 1. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm permit requirements and applicable zoning for your property. 2. Confirm whether the property is in Webster County or Choctaw County portion of Mathiston. 3. Submit building permit application via online portal (ms.accessgov.com/mathiston/Forms/Page/mathiston/building-permit/), in person at 41 Mathis Drive, or by mail at P.O. Box 178, Mathiston, MS 39752. 4. Prepare required supporting documentation: site plan showing lot, setbacks, and existing/proposed structures, construction drawings (stamped if required by project type or value), contractor license verification for MSBOC-threshold projects, septic permit receipt if applicable. 5. Pay applicable fees at time of submission or upon approval. 6. Receive permit and post on construction site. 7. Schedule and complete required inspections. 8. Obtain final approval upon satisfactory final inspection.
03 How long does it take to get a building permit in Mathiston, MS?
Building permit processing times in Mathiston, MS typically run Varies by project complexity; contact Town Hall for estimate.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Mathiston, MS?
Not all construction work requires a permit in Mathiston, MS. The following work is generally exempt: Cosmetic interior work (painting, flooring, cabinet replacement); Minor repairs not affecting structural elements or systems. Note: Confirm exemptions with Town Hall before proceeding. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Mathiston, MS?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Mathiston, MS via: (662) 263-4898, townofmathiston@maxxsouth.net.
last verified April 2026 source Town of Mathiston — Town Hall ↗ entry id permits/mississippi/webster/mathiston

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Mathiston — Town Hall before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Webster County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Webster County jurisdictions →