jaspector
City building permits

Town of Sumner

How to apply for a building permit in Town of Sumner, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Sumner — Town Hall

Street address
507 Walnut Street, Sumner, MS 38957
Coverage
All properties within the incorporated Town of Sumner, located in the Second Judicial District of Tallahatchie County. Sumner is the county seat for the Second Judicial District with a population of approximately 278 (2020 Census).
§ 02

When a permit is required

Permit triggers and exempt work for Sumner

New construction of any building, additions or substantial alterations, demolition or relocation of structures, sign permits, electrical, plumbing, or mechanical system installation/upgrades, and any construction in a FEMA-designated flood zone.

Note: No specific exemptions documented. Contact Town Hall to confirm if any work may be exempt from permitting.

Required documents
  • Building permit application
  • Project description
  • Property information
  • Estimated cost
Building code
Sumner has not publicly specified the building code edition adopted. Contact Town Hall at (662) 375-8773 to confirm the currently enforced code. Mississippi municipalities may adopt IBC/IRC editions consistent with the Mississippi Building Codes Council's approved list; the 2021 IBC/IRC are current state-level reference standards (effective 2024).
Permit validity
Not specified; contact Town Hall.
Owner-builder
Not specified; contact Town Hall.
Contractor requirements
Contractors must hold a valid Mississippi State Board of Contractors (MSBOC) license if contract value exceeds $50,000 (commercial/new residential) or $10,000 (residential remodeling).
§ 03

Application process

Typical processing: Not specified; contact Town Hall for current processing timeframe.

  1. 01
    Contact Town Hall at (662) 375-8773 or email sumnertownof@bellsouth.net.
  2. 02
    Obtain and complete a Building Permit Application form.
  3. 03
    Submit with project description, property information, and estimated cost.
  4. 04
    Town reviews for zoning compliance and code requirements.
  5. 05
    Applicant is notified of approval or corrections needed.
  6. 06
    Permit fee is paid and permit is issued upon approval.
  7. 07
    Inspections are scheduled at required construction stages.

Typical processing time: Not specified; contact Town Hall for current processing timeframe.

§ 04

Required inspections

Scheduling and sequence

Inspection hours
Monday–Friday, 8:30 a.m.–4:30 p.m. (Closed Wednesday at noon)

Typical sequence: Inspections are coordinated through Town Hall. Standard inspection stages: Foundation/Footing, Framing, Rough-In (MEP systems), and Final Inspection.

§ 05

Frequently asked

Common questions about Sumner permits

01 Do I need a building permit in Sumner, MS?
New construction of any building, additions or substantial alterations, demolition or relocation of structures, sign permits, electrical, plumbing, or mechanical system installation/upgrades, and any construction in a FEMA-designated flood zone.
02 How do I apply for a building permit in Sumner, MS?
To apply for a building permit in Sumner, MS, follow these steps: 1. Contact Town Hall at (662) 375-8773 or email sumnertownof@bellsouth.net. 2. Obtain and complete a Building Permit Application form. 3. Submit with project description, property information, and estimated cost. 4. Town reviews for zoning compliance and code requirements. 5. Applicant is notified of approval or corrections needed. 6. Permit fee is paid and permit is issued upon approval. 7. Inspections are scheduled at required construction stages.
03 How long does it take to get a building permit in Sumner, MS?
Building permit processing times in Sumner, MS typically run Not specified; contact Town Hall for current processing timeframe.. Timelines can vary based on project complexity and current department workload.
last verified April 2026 entry id permits/mississippi/tallahatchie/sumner

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Sumner — Town Hall before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Tallahatchie County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Tallahatchie County jurisdictions →