City Building Permits

Town of Taylorsville, MS - 2026 Building Permit Guide

How to apply for a building permit in Town of Taylorsville, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Mississippi Smith County Updated March 2026

Permit Authority

All properties within the incorporated limits of the Town of Taylorsville. Taylorsville is the largest incorporated town in Smith County and a Mississippi Main Street Community.

Department
Town of Taylorsville Town Hall
Address
125 Eaton Street, Taylorsville, MS 39168
Phone
601-785-6531

Application Process

  1. Contact Taylorsville Town Hall at 601-785-6531 (M–F, 8:00 a.m. – 5:00 p.m.).
  2. Confirm permit requirements for the specific project.
  3. Obtain building permit application form from Town Hall.
  4. Prepare two (2) sets of construction plans.
  5. Obtain MSDH Form 335 septic evaluation from Smith County Health Department (601-782-4472) if not on public sewer.
  6. Submit completed application, plans, and supporting documentation.
  7. Pay applicable permit fees.
  8. Obtain permit and begin construction.
  9. Schedule required inspections.
  10. Obtain final inspection approval before occupancy.

General Requirements

New residential construction, new commercial or industrial construction, structural additions or alterations, change of use or occupancy, and major structural remodeling.

Required Documents

  • Completed building permit application
  • Two (2) sets of construction plans: site/plot plan, foundation and footing details, framing details, electrical layout, and elevations (front, side, rear)
  • Proof of property ownership
  • MSDH Form 335 (if not on public sewer)
Building code
Taylorsville must adopt one of the last three editions of the IBC or IRC as a minimum code per Mississippi law. The statewide baseline is 2021 IBC / 2021 IRC with Mississippi amendments (effective July 1, 2024). Confirm specific adopted edition with Town Hall.
Contractor requirements
Contractors must hold a valid MSBOC license for projects $50,000 or more (residential new construction) or $10,000+ (residential remodeling/roofing). Contact MSBOC at 800-880-6161 or https://www.msboc.us/

Fees

Payment note
No fee schedule is publicly available online. Contact Town Hall at 601-785-6531 for current permit fees.

Work That Does NOT Require a Permit

Contact the Town of Taylorsville Town Hall to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • Town Hall (phone)
Inspection hours
Monday–Friday, 8:00 a.m. – 5:00 p.m.

Typical inspection sequence: Standard inspection stages for residential construction: 1) Foundation/footing inspection, 2) Framing inspection, 3) Electrical rough-in inspection, 4) Plumbing rough-in inspection (if applicable), 5) HVAC inspection (if applicable), 6) Final inspection before occupancy. Confirm inspection scheduling and stages with Town Hall at permit issuance. Septic inspection by MSDH or Smith County Health Department required separately for properties not on public sewer.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Taylorsville Town Hall before applying.

Frequently Asked Questions

Town of Taylorsville Building Permit FAQ

Do I need a building permit in Town of Taylorsville, MS?
New residential construction, new commercial or industrial construction, structural additions or alterations, change of use or occupancy, and major structural remodeling.
How do I apply for a building permit in Town of Taylorsville, MS?
1. Contact Taylorsville Town Hall at 601-785-6531 (M–F, 8:00 a.m. – 5:00 p.m.). 2. Confirm permit requirements for the specific project. 3. Obtain building permit application form from Town Hall. 4. Prepare two (2) sets of construction plans. 5. Obtain MSDH Form 335 septic evaluation from Smith County Health Department (601-782-4472) if not on public sewer. 6. Submit completed application, plans, and supporting documentation. 7. Pay applicable permit fees. 8. Obtain permit and begin construction. 9. Schedule required inspections. 10. Obtain final inspection approval before occupancy.
How do I schedule a building inspection in Town of Taylorsville, MS?
Inspections can be scheduled via: Town Hall.

Need help with your project?

Navigating permits in Town of Taylorsville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Smith County

View all Smith County jurisdictions →