How to apply for a building permit in City of Batesville, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Batesville Code Office

Street address
146 Public Square, Batesville, MS 38606
Coverage
All properties within the incorporated City of Batesville.
§ 02

When a permit is required

Permit triggers and exempt work for Batesville

Building permits are required for all new construction (residential and commercial), additions, alterations, enlargements, enclosures, accessory buildings, renovations, plumbing, electrical, gas, mechanical installations, signs, swimming pools, demolition, and mobile/manufactured home placement within the City of Batesville.

Storage buildings of 120 sq. ft. or less do not require a building permit (residential or commercial).
  • Exempt Storage buildings of 120 sq. ft. or less do not require a building permit (residential or commercial).

Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm exemption applicability with the Code Office at (662) 563-6621 before proceeding.

Required documents
  • Completed permit application
  • Site plans
  • Contractor license copies
  • Flood Plain Development Permit application (if in flood zone)
Building code
2012 International Building Code (IBC), 2012 International Residential Code (IRC), 2012 International Existing Building Code, 2012 International Fuel Gas Code, 2012 International Plumbing Code, 2012 International Mechanical Code, 2012 International Swimming Pool and Spa Code, 2012 International Property Maintenance Code, 2012 International Fire Code, 2012 NFPA 1 and NFPA 101, 2011 NFPA 70 (National Electrical Code).
Permit validity
Not specified; contact the Code Office for permit validity periods.
Owner-builder
Not specified; contact the Code Office for owner-builder requirements.
Contractor requirements
Contractors must hold valid licenses as required by state law. Confirm specific requirements with the Code Office at (662) 563-6621.

Source: City of Batesville Code Office ↗

§ 03

Application process

Typical processing: Not specified; contact the Code Office for current processing timeline.

  1. 01
    Download the applicable permit application form from batesville.ms/business/permit-forms/ or pick up in person at the Code Office.
  2. 02
    If the project is in a flood zone, also complete the Flood Plain Development Permit application.
  3. 03
    Submit completed application with required documentation (site plans, contractor license copies, etc.) to the Code Office at 146 Public Square.
  4. 04
    Staff reviews application; fee is calculated per the Valuation of Construction Fee Schedule.
  5. 05
    Pay permit fee (fee calculated using square footage valuation method).
  6. 06
    Permit issued; post on job site.
  7. 07
    Schedule required inspections with Building Inspector Dennis Barfield at (662) 563-6621.
  8. 08
    Final inspection and Certificate of Occupancy issued upon completion.

Typical processing time: Not specified; contact the Code Office for current processing timeline.

Source: City of Batesville Code Office ↗

§ 04

Fee schedule

Effective February 1, 2006 (verify current applicability with Code Office)

Fee type
Amount
01
Minimum permit fee
Varies by construction type (see fee schedule)
02
Plan check fee
1/2 of the building permit fee for commercial/industrial new construction or renovation 5,000 sq. ft. and up
03
Permit fee formula
Based on valuation calculated by square footage rate, then tiered permit fee applied ($15 for first $1,000 + $5 per $1,000 above; $50K–$99,999: $260 + $4 per $1,000 above; etc.)
04
Reinspection fee
$100.00 per re-inspection of the same type

Fees change periodically. Confirm at the official fee schedule ↗ (effective February 1, 2006 (verify current applicability with Code Office)) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (662) 563-6621 (phone)
  • codeinspector@batesville.ms (email)
Scheduling deadline
Contact Building Inspector Dennis Barfield to schedule.
Inspection hours
Monday–Friday, 7:00 AM – 4:00 PM
Time windows
Not specified; contact Code Office.

Typical sequence: Standard inspection stages for new construction typically include: foundation/footing, framing (prior to sheathing/drywall), rough-in (plumbing, electrical, mechanical), insulation, and final inspection/Certificate of Occupancy. Confirm specific stages with the Code Office.

Source: City of Batesville Code Office ↗

§ 06

Frequently asked

Common questions about Batesville permits

01 Do I need a building permit in Batesville, MS?
Building permits are required for all new construction (residential and commercial), additions, alterations, enlargements, enclosures, accessory buildings, renovations, plumbing, electrical, gas, mechanical installations, signs, swimming pools, demolition, and mobile/manufactured home placement within the City of Batesville.
02 How much does a building permit cost in Batesville, MS?
Building permit fees in Batesville, MS are set by the local building department and vary by project type and valuation. The minimum permit fee is Varies by construction type (see fee schedule). Fees are calculated as: Based on valuation calculated by square footage rate, then tiered permit fee applied ($15 for first $1,000 + $5 per $1,000 above; $50K–$99,999: $260 + $4 per $1,000 above; etc.). Plan check fee: 1/2 of the building permit fee for commercial/industrial new construction or renovation 5,000 sq. ft. and up.
03 How do I apply for a building permit in Batesville, MS?
To apply for a building permit in Batesville, MS, follow these steps: 1. Download the applicable permit application form from batesville.ms/business/permit-forms/ or pick up in person at the Code Office. 2. If the project is in a flood zone, also complete the Flood Plain Development Permit application. 3. Submit completed application with required documentation (site plans, contractor license copies, etc.) to the Code Office at 146 Public Square. 4. Staff reviews application; fee is calculated per the Valuation of Construction Fee Schedule. 5. Pay permit fee (fee calculated using square footage valuation method). 6. Permit issued; post on job site. 7. Schedule required inspections with Building Inspector Dennis Barfield at (662) 563-6621. 8. Final inspection and Certificate of Occupancy issued upon completion.
04 How long does it take to get a building permit in Batesville, MS?
Building permit processing times in Batesville, MS typically run Not specified; contact the Code Office for current processing timeline.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Batesville, MS?
Not all construction work requires a permit in Batesville, MS. The following work is generally exempt: Storage buildings of 120 sq. ft. or less do not require a building permit (residential or commercial).. Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm exemption applicability with the Code Office at (662) 563-6621 before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Batesville, MS?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Batesville, MS via: (662) 563-6621, codeinspector@batesville.ms. Contact Building Inspector Dennis Barfield to schedule..
last verified April 2026 source City of Batesville Code Office ↗ entry id permits/mississippi/panola/batesville

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Batesville Code Office before applying. Jaspector is not legal advice.