§ 01

Permit authority

Lamar County Planning and Community Development Department

Street address
202 Main Street, #B, Purvis, MS 39475
Coverage
All unincorporated properties within Lamar County.
§ 02

When a permit is required

Permit triggers and exempt work for Lamar County

Remodeling or expanding a residence when the total project value exceeds $10,000.00. A Flood Permit is required for any structure requiring a utility of any type.

Note: For information on exempt work, contact the Lamar County Planning Department at (601) 794-1024.

Required documents
  • Completed residential construction permit application form
  • Project details and scope information
  • Supporting documentation as required by Planning Department
Building code
Lamar County Board of Supervisors has NOT adopted structural codes and has NOT implemented any structural code-based inspections.
Permit validity
Not specified; contact Planning Department.
Owner-builder
Applicable for owner-builder projects under $10,000 in value.
Contractor requirements
If hiring a contractor or sub-contractor for projects over $10,000, they must obtain a permit. If no general contractor is used, each individual trade will need a permit. Contractors must be licensed by the Mississippi State Board of Contractors.

Source: Lamar County Planning and Community Development Department ↗

§ 03

Application process

Typical processing: Processing time not specified; contact Planning Department for estimates.

  1. 01
    Contact the Lamar County Planning Department at (601) 794-1024 during business hours.
  2. 02
    Obtain the residential construction permit application form from the Planning Department.
  3. 03
    Complete the application with required information about the proposed project.
  4. 04
    Submit application with required attachments and supporting documents.
  5. 05
    Planning Department staff will review the application.
  6. 06
    Pay the required permit fee ($50.00 for residential construction).
  7. 07
    Receive signed-off permit upon approval.

Typical processing time: Processing time not specified; contact Planning Department for estimates.

Source: Lamar County Planning and Community Development Department ↗

§ 04

Fee schedule

Lamar County building permit fees

Fee type
Amount
01
Minimum permit fee
$50.00
02
Permit fee formula
Flat fee for residential construction permits.

Fee payable at time of application.

§ 05

Required inspections

Scheduling and sequence

Typical sequence: Lamar County unincorporated areas currently do NOT conduct inspections on single-family residential construction and do NOT conduct structural inspections for any construction project in unincorporated areas.

Source: Lamar County Planning and Community Development Department ↗

§ 06

Frequently asked

Common questions about unincorporated Lamar County permits

01 Do I need a building permit in unincorporated Lamar County, MS?
Remodeling or expanding a residence when the total project value exceeds $10,000.00. A Flood Permit is required for any structure requiring a utility of any type.
02 How much does a building permit cost in unincorporated Lamar County, MS?
Building permit fees in unincorporated Lamar County, MS are set by the local building department and vary by project type and valuation. The minimum permit fee is $50.00. Fees are calculated as: Flat fee for residential construction permits..
03 How do I apply for a building permit in unincorporated Lamar County, MS?
To apply for a building permit in unincorporated Lamar County, MS, follow these steps: 1. Contact the Lamar County Planning Department at (601) 794-1024 during business hours. 2. Obtain the residential construction permit application form from the Planning Department. 3. Complete the application with required information about the proposed project. 4. Submit application with required attachments and supporting documents. 5. Planning Department staff will review the application. 6. Pay the required permit fee ($50.00 for residential construction). 7. Receive signed-off permit upon approval.
04 How long does it take to get a building permit in unincorporated Lamar County, MS?
Building permit processing times in unincorporated Lamar County, MS typically run Processing time not specified; contact Planning Department for estimates.. Timelines can vary based on project complexity and current department workload.
last verified April 2026 source Lamar County Planning and Community Development Department ↗ entry id permits/mississippi/lamar/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Lamar County Planning and Community Development Department before applying. Jaspector is not legal advice.