On this page 6
When a permit is required
Permit triggers and exempt work for Glen
A building permit is required for new construction, major renovations and additions, electrical, plumbing, mechanical, HVAC systems, roofing and siding work, decks, pools, structures, and demolition.
Note: Contact Town Hall for information on work that may not require a permit.
- Completed permit application
- Site plan/survey
- Construction drawings
- Contractor licensing information
- Project description and cost estimate
- Building code
- One of three most recent IBC or IRC editions. Contact Town Hall for specific edition adopted.
- Permit validity
- Contact Town Hall for permit validity duration.
- Contractor requirements
- For projects over $50,000, contractors must hold valid MSBOC (Mississippi State Board of Contractors) license.
Application process
Typical processing: Contact Town Hall for specific timeframe.
- 01 Contact Glen Town Hall at (662) 286-8288.
- 02 Obtain building permit application in-person or by request.
- 03 Complete application with: site plan/survey, construction drawings, contractor licensing information, project description and cost estimate.
- 04 Submit to Town Hall.
- 05 Building inspector reviews for code compliance.
- 06 Permit issued upon approval.
- 07 Inspections scheduled as required.
Typical processing time: Contact Town Hall for specific timeframe.
Fee schedule
Glen building permit fees
Required inspections
Scheduling and sequence
- Glen Town Hall: (662) 286-8288 (phone)
Typical sequence: Required Inspections: Foundation/footing, Framing, MEP (Mechanical, Electrical, Plumbing), Final inspection. Schedule inspections through Town Hall during construction process.
Frequently asked
Common questions about Glen permits
01 Do I need a building permit in Glen, MS? ▸
02 How much does a building permit cost in Glen, MS? ▸
03 How do I apply for a building permit in Glen, MS? ▸
04 How long does it take to get a building permit in Glen, MS? ▸