jaspector
§ MN Scott County
City building permits

Credit River

How to apply for a building permit in Credit River, Minnesota. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development

Street address
18985 Meadow View Boulevard, Prior Lake, MN 55372
Coverage
City permit authority inside Credit River; septic remains with Scott County Environmental Services
Online portal
Permit portal
Credit River Building Permit Portal
§ 02

When a permit is required

Permit triggers and exempt work for Credit River

Building, deck, pool, accessory structure, remodel, mechanical, plumbing, roofing, siding, windows, doors, and similar code-regulated work; septic review routes to Scott County

Fences do not require a permit in Credit River
  • Exempt Fences do not require a permit in Credit River
Required documents
  • Permit-specific checklist items, electronic plans, certificate of survey where required, NPDES agreement for applicable projects, homeowner acknowledgment when owner is contractor, and permit supplements by project type
Building code
Minnesota State Building Code as enforced by the city
Permit validity
Not clearly summarized on the public permits page reviewed
Owner-builder
Acknowledgement of Homeowner is required when the property owner is the contractor
Contractor requirements
Minnesota contractor and trade licensing rules apply; inspection work is coordinated with Metro West
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Review the permit-specific checklist on the city building permits page.
  2. 02
    Assemble electronic plans and name files per the city plan upload requirements.
  3. 03
    Submit the application in the online permit portal.
  4. 04
    Respond to any review comments; homeowner acknowledgment is required if the owner is acting as contractor.
  5. 05
    Once approved, pay fees and escrows through the portal payment path or by check.
  6. 06
    Schedule inspections with Metro West inspection staff.

Source: Community Development ↗

§ 04

Fee schedule

Credit River building permit fees

Fee type
Amount
01
Plan check fee
Included through permit review and escrow structure as applicable
02
Permit fee formula
Mix of permit fees and escrows by permit type, with online or check payment before issuance
03
Reinspection fee
Confirm against current fee schedule and portal invoicing

Fees and escrows may be paid via the city portal payment path or by check; all fees must be paid before permit issuance

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Schedule all required inspections with Kevin Matiak at Metro West, 763-479-1720 (phone)

Corrections that fail inspection require follow-up inspection before final approval

§ 06

Frequently asked

Common questions about Credit River permits

01 Do I need a building permit in Credit River, MN?
Building, deck, pool, accessory structure, remodel, mechanical, plumbing, roofing, siding, windows, doors, and similar code-regulated work; septic review routes to Scott County
02 How much does a building permit cost in Credit River, MN?
Building permit fees in Credit River, MN are set by the local building department and vary by project type and valuation. Fees are calculated as: Mix of permit fees and escrows by permit type, with online or check payment before issuance. Plan check fee: Included through permit review and escrow structure as applicable.
03 How do I apply for a building permit in Credit River, MN?
To apply for a building permit in Credit River, MN, follow these steps: 1. Review the permit-specific checklist on the city building permits page. 2. Assemble electronic plans and name files per the city plan upload requirements. 3. Submit the application in the online permit portal. 4. Respond to any review comments; homeowner acknowledgment is required if the owner is acting as contractor. 5. Once approved, pay fees and escrows through the portal payment path or by check. 6. Schedule inspections with Metro West inspection staff.
04 What work is exempt from building permits in Credit River, MN?
Not all construction work requires a permit in Credit River, MN. The following work is generally exempt: Fences do not require a permit in Credit River. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Credit River, MN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Credit River, MN via: Schedule all required inspections with Kevin Matiak at Metro West, 763-479-1720.
last verified April 2026 source Community Development ↗ entry id permits/minnesota/scott-mn/credit-river

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development before applying. Jaspector is not legal advice.