City of St. Louis Park

How to apply for a building permit in City of St. Louis Park, Minnesota. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Building and Energy Department

Street address
5005 Minnetonka Blvd., St. Louis Park, MN 55416
Coverage
City of St. Louis Park issues construction permits and inspections within St. Louis Park; engineering permits such as erosion control and dewatering are handled by separate city workflows.
Online portal
City permits page and online application workflow
City permits page and online application workflow
§ 02

When a permit is required

Permit triggers and exempt work for St. Louis Park

Engineering permit materials state smaller landscaping or emergency soil disturbance can be exempt from erosion-control permits.
  • Exempt Engineering permit materials state smaller landscaping or emergency soil disturbance can be exempt from erosion-control permits.
Required documents
  • When a permit is required: The department issues permits for construction and inspects new construction and remodeling for compliance with Minnesota State Building Code.
  • Required documents: Building permit application, project valuation, owner and contractor information, and project-specific plans; separate engineering or zoning permit packages may also be required.
  • Owner-builder rules if available: The building permit application allows owner applicants.
  • Contractor license requirements: The city licenses mechanical contractors and enforces applicable state licensing requirements.
  • Building code adopted: Minnesota State Building Code plus applicable city ordinances.
Building code
Minnesota State Building Code plus applicable city ordinances.
§ 03

Application process

Typical processing: Engineering erosion-control permits generally take about two weeks if complete; no single citywide building-review standard was clearly posted in the reviewed sources.

  1. 01
    Complete the city permit application and assemble required plans and valuation information.
  2. 02
    Submit the permit through the city's permit process and address any zoning or engineering permits required for the project.
  3. 03
    Respond to city review comments and secure any related engineering permits such as erosion control when applicable.
  4. 04
    Pay fees, obtain the permit, and complete inspections through Building and Energy.

Typical processing time: Engineering erosion-control permits generally take about two weeks if complete; no single citywide building-review standard was clearly posted in the reviewed sources.

Source: Building and Energy Department ↗

§ 04

Fee schedule

St. Louis Park building permit fees

Fee type
Amount
01
Minimum permit fee
Not clearly isolated in the reviewed snippets.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Frequently asked

Common questions about St. Louis Park permits

01 How much does a building permit cost in St. Louis Park, MN?
Building permit fees in St. Louis Park, MN are set by the local building department and vary by project type and valuation. The minimum permit fee is Not clearly isolated in the reviewed snippets..
02 How do I apply for a building permit in St. Louis Park, MN?
To apply for a building permit in St. Louis Park, MN, follow these steps: 1. Complete the city permit application and assemble required plans and valuation information. 2. Submit the permit through the city's permit process and address any zoning or engineering permits required for the project. 3. Respond to city review comments and secure any related engineering permits such as erosion control when applicable. 4. Pay fees, obtain the permit, and complete inspections through Building and Energy.
03 How long does it take to get a building permit in St. Louis Park, MN?
Building permit processing times in St. Louis Park, MN typically run Engineering erosion-control permits generally take about two weeks if complete; no single citywide building-review standard was clearly posted in the reviewed sources.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in St. Louis Park, MN?
Not all construction work requires a permit in St. Louis Park, MN. The following work is generally exempt: Engineering permit materials state smaller landscaping or emergency soil disturbance can be exempt from erosion-control permits.. When in doubt, confirm with the local building department before starting work.