§ 01

Permit authority

Carver County Land Management

Street address
600 E 4th Street, Chaska, MN 55318
Coverage
Carver County handles permit and zoning administration in Dahlgren Township.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Dahlgren Township

County permit trigger rules apply.

Detached sheds and similar structures up to 200 square feet
Fences up to 7 feet high
Certain low decks, sidewalks, driveways, and finish work
Other county-listed exempt equipment work
  • Exempt Detached sheds and similar structures up to 200 square feet
  • Exempt Fences up to 7 feet high
  • Exempt Certain low decks, sidewalks, driveways, and finish work
  • Exempt Other county-listed exempt equipment work
Required documents
  • Application
  • plans
  • specs
  • and engineering if required.
Building code
Minnesota State Building Code; county overview letter still cites 2015.
Permit validity
180-day abandonment and expiration rules apply.
Contractor requirements
Minnesota licensing rules apply.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Check county zoning and land use requirements for the site.
  2. 02
    Complete the county application and compile plan documents.
  3. 03
    Submit to county Land Management.
  4. 04
    Pay fees.
  5. 05
    Review is coordinated with Metro West.
  6. 06
    Permit is issued and inspections are scheduled through Metro West.

Source: Carver County Land Management ↗

§ 04

Fee schedule

Dahlgren Township building permit fees

Fee type
Amount
01
Plan check fee
Additional review fees apply
02
Permit fee formula
Valuation based building fees plus category fees and surcharges
03
Reinspection fee
Reinspection fees may apply; replacement inspection card fee is $30

Completed applications left unpaid over 180 days expire

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 763-479-1720 (phone)
Inspection hours
Monday through Friday, 7:00 a.m. to 4:30 p.m.

Typical sequence: Foundation, framing and rough-ins, final

Reinspection fee may apply if not ready

§ 06

Frequently asked

Common questions about Dahlgren Township permits

01 Do I need a building permit in Dahlgren Township, MN?
County permit trigger rules apply.
02 How much does a building permit cost in Dahlgren Township, MN?
Building permit fees in Dahlgren Township, MN are set by the local building department and vary by project type and valuation. Fees are calculated as: Valuation based building fees plus category fees and surcharges. Plan check fee: Additional review fees apply.
03 How do I apply for a building permit in Dahlgren Township, MN?
To apply for a building permit in Dahlgren Township, MN, follow these steps: 1. Check county zoning and land use requirements for the site. 2. Complete the county application and compile plan documents. 3. Submit to county Land Management. 4. Pay fees. 5. Review is coordinated with Metro West. 6. Permit is issued and inspections are scheduled through Metro West.
04 What work is exempt from building permits in Dahlgren Township, MN?
Not all construction work requires a permit in Dahlgren Township, MN. The following work is generally exempt: Detached sheds and similar structures up to 200 square feet; Fences up to 7 feet high; Certain low decks, sidewalks, driveways, and finish work; Other county-listed exempt equipment work. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Dahlgren Township, MN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Dahlgren Township, MN via: 763-479-1720.
last verified April 2026 source Carver County Land Management ↗ entry id permits/minnesota/carver/dahlgren-township

Educational reference. Permit rules and fees change — confirm current requirements directly with Carver County Land Management before applying. Jaspector is not legal advice.