When a permit is required
Permit triggers and exempt work for Erving
A building permit is required for new construction, additions, alterations, renovations affecting structural elements, and similar work.
- Exempt One-story detached accessory structures (tool sheds, playhouses) with floor area not greater than 120 sq ft
- Exempt Fences not exceeding 7 feet in height
- Exempt Oil derricks
- Exempt Retaining walls not over 4 feet in height (measured from bottom of footing to top of wall), unless supporting a surcharge or impounding Class I, II, or IIIA liquids
- Exempt Water tanks supported directly on grade, capacity not greater than 5,000 gallons, with height-to-diameter ratio not greater than 2:1
- Exempt Sidewalks and driveways not more than 30 inches above adjacent grade, not over any basement or story below, and not part of an accessible route
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Exempt Temporary motion picture, television, and theater stage sets and scenery
- Exempt Above-ground residential swimming pools less than 24 inches deep or not greater than 5,000 gallons
- Exempt Shade cloth structures for agricultural use (excluding attached service systems)
- Exempt Swings and playground equipment accessory to single- or two-family dwellings
- Exempt Window awnings in residential and utility occupancies projecting not more than 54 inches from the exterior wall
- Exempt Movable cases, counters, and partitions not over 5 feet 9 inches in height
- Exempt Plastic-covered greenhouse structures (excluding large assembly occupancies and attached service systems)
- Exempt Ordinary repairs and routine maintenance that do not affect structural elements, fire protection systems, or regulated systems
Note: FCCIP enforces standard 780 CMR exemptions. Work near the Millers River or wetlands requires Conservation Commission review under the Wetlands Protection Act.
- Completed permit application (electronic via PermitEyes)
- Construction plans and drawings
- Plot plan or site plan
- Workers' Compensation Affidavit (contractor applications)
- CSL number and license copy (contractor applications)
- HIC registration (residential improvement work)
- Building code
- Massachusetts State Building Code (780 CMR, 10th Edition as of July 1, 2025; based on 2021 IBC)
- Permit validity
- All permits valid for six months from date of issuance per 780 CMR.
- Owner-builder
- Homeowner exemption available for one- or two-family dwelling at primary residence without CSL.
- Contractor requirements
- Construction Supervisor License (CSL) required for contractor-supervised work on regulated structures.
Application process
Typical processing: Reviewed per 780 CMR guidelines (maximum 30 days). Note: 10th Edition of 780 CMR mandatory as of July 1, 2025 for all new permit applications.
- 01 Confirm zoning compliance; contact Building Commissioner Jim Hawkins (413-774-3167 ext. 113) or Erving's town administrator for zoning questions.
- 02 Register or log in to PermitEyes via the FCCIP/FRCOG system.
- 03 Complete permit application electronically.
- 04 Upload all required documents per FCCIP minimum submittal requirements: construction plans/drawings, plot plan or site plan, Workers' Compensation Affidavit, CSL documentation, HIC registration.
- 05 Pay fees via UniBank online (after fee assessment) or mail check to FRCOG, 12 Olive Street, Suite 2, Greenfield, MA 01301.
- 06 Application reviewed by FCCIP staff and Erving town officials.
- 07 Permit issued; print from PermitEyes and post on site.
- 08 Schedule inspections via PermitEyes or by calling 413-774-3167.
Typical processing time: Reviewed per 780 CMR guidelines (maximum 30 days). Note: 10th Edition of 780 CMR mandatory as of July 1, 2025 for all new permit applications.
Source: Building Inspector (administered by Franklin County Cooperative Inspection Program / FRCOG) ↗
Required inspections
Scheduling and sequence
- PermitEyes portal (online)
- 413-774-3167 (phone)
- Inspection hours
- FCCIP: Monday-Friday, 8:00 AM - 4:00 PM (building inspections); Electrical: 7-9 AM M-F; Plumbing/Gas: 7-9 AM M-Th
Typical sequence: Required inspections include: footing/foundation (before backfill), framing (before insulation/drywall), insulation/energy compliance (as applicable), final building inspection, electrical rough and final, plumbing rough and final, gas rough and final, Certificate of Occupancy.
Source: Building Inspector (administered by Franklin County Cooperative Inspection Program / FRCOG) ↗
Frequently asked
Common questions about Erving permits
01 Do I need a building permit in Erving, MA? ▸
02 How do I apply for a building permit in Erving, MA? ▸
03 How long does it take to get a building permit in Erving, MA? ▸
04 What work is exempt from building permits in Erving, MA? ▸
05 How do I schedule a building inspection in Erving, MA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspector (administered by Franklin County Cooperative Inspection Program / FRCOG) before applying. Jaspector is not legal advice.